NPDES TXR1542RC · Clean Water Act
HC 220122 - D139-00-00-X012, Houston, TX: NPDES TXR1542RC discharge permit, effluent exceedances, inspections, penalties
HC 220122 - D139-00-00-X012, Houston, Texas: General permit coverage TXR1542RC, held by Environmental Allies, LLC; Construction stormwater; Effective; issued June 7, 2024, term to March 4, 2028; discharges to WILLOW WATERHOLE BAYOU ABOVE TIDAL.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 7,610 were issued before TXR1542RC. Environmental Allies, LLC holds 66 permits in Texas.
Other permits held by Environmental Allies, LLC
- ENVIRONMENTAL ALLIES - CONCRETE BATCH PLANT, Houston: TXR05GP09, issued 2024-12-13
- BAYSIDE TERRACE DRAINAGE IMPROVEMENTS, La Porte: TXR1502NU, issued 2023-07-28
- T101 - HC 220122 - GENERAL REPAIRS IN SOUTH HARRI, Katy: TXR1505OT, issued 2023-10-19
- CARPENTERS BAYOU TRAIL AND PEDESTIRAN BIKE BRIDGE, Houston: TXR1511RZ, issued 2024-08-30
- HCFCD 250370 MAJOR REPAIRS TO BRAYS BAYOU FOR THE, Houston: TXR1511XK, issued 2026-02-20
- HC 240076-EXTENSION OF MOUND ROAD FROM GREENHOUSE, Cypress: TXR1513QW, issued 2024-05-14
- NW HC MUD 24-PROPOSED ASHCREEK SIDEWALKS AND RAMPS, Houston: TXR1514YH, issued 2026-05-18
- TXDOT-CCSJ 0976-01-047 - HARRIS FM 865, Houston: TXR1515XO, issued 2026-03-06
- BEAR CREEK VILLAGE SUBDIVISION DRAINAGE IMPROVEMENTS, Houston: TXR1517MZ, issued 2023-05-31
- WIDENING & CONCRETE REHAB OF ANDERS LANE, Kemah: TXR1517QZ, issued 2024-05-27
Coverages issued nearest TXR1542RC
- 2024-06-07: SUNSET RANCH PHASE 1, Gunter: TXR1536RC, held by Hammett Excavation, Inc.
- 2024-06-07: SUNSET RANCH PHASE 2A & 2B, Gunter: TXR1537RC, held by Hammett Excavation, Inc.
- 2024-06-07: THE VINEYARDS AT ESCONDIDO RANCH, Lubbock: TXR1538RC, held by VANCE, MATT
- 2024-06-07: ALEXANDER ISLAND, Baytown: TXR1540RC, held by E&L Construction Group
- 2024-06-07: SUGAR LAND - UNIVERSITY BLVD WIDENING, Sugar Land: TXR1541RC, held by Environmental Allies, LLC
- 2024-06-07: CENTREPORTDFW AIRPORT STATION PROPOSED HIKE AND BIKE TRAIL, Fort Worth: TXR1543RC, held by City of Fort Worth
- 2024-06-07: ROARING SPRINGS SWITCH YARD, Afton: TXR1544RC, held by Moss & Associates, LLC
- 2024-06-07: LINDER ELEMENTARY SCHOOL, Austin: TXR1546RC, held by Bartlett Cocke General Contractors, LLC
- 2024-06-07: FULSHEAR MUD 3B - WATER PLANT NO1 PHASE 1, Brookshire: TXR1547RC, held by R & B group, Inc.
- 2024-06-08: VALLE NUEVO UNIT 1, El Paso: TXR1548RC, held by Bowling Construction, LLC
HC 220122 - D139-00-00-X012 among its neighbors
229 discharge permits are in the Keegans Bayou-Brays Bayou subwatershed (HUC 120401040401); TXR1542RC is one. Its county: 4,455, 195 major; TXR1542RC is minor permit.
Other permits in the Keegans Bayou-Brays Bayou subwatershed (HUC 120401040401)
- 11116 BELLAIRE BLVD, Houston: TXR1516PK, minor, term to 2028-03-04
- 33 ACRES AT FM 1464 AND BEECHNUT, Houston: TXR1520NC, minor, term to 2028-03-04
- ADDICKS PLANT, Houston: TXG110467, minor, term to 2011-11-07
- ADDICKS PLANT, City Of Houston: TXG111820, minor, term to 2016-11-07
- AI HOA PAD BUILDING A, Houston: TXR1597PL, minor, term to 2028-03-04
- ALIEF AG FACILITY, Houston: TXR1556VO, minor, term to 2028-03-04
- ALIEF CHILLER REPLACEMENTS - MULTI CAMPUS, Houston: TXR1516WP, minor, term to 2028-03-04
- ALIEF ISD LEROY CRUMP STADIUM, Houston: TXR1522WO, minor, term to 2028-03-04
- ALIEF ISD YWLS DRIVEWAY IMPROVEMENT, Houston: TXR1598XX, minor, term to 2028-03-04
- ALIEF SUPPORT FACILITY, Houston: TXR05BO39, minor, term to 2026-08-13
What stands out
- Its term runs 3 years and 271 days, June 7, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HC 220122 - D139-00-00-X012 |
|---|---|
| Permittee | Environmental Allies, LLC |
| NPDES ID | TXR1542RC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 7, 2024 |
| Expires | March 4, 2028 |
| Address | Houston, TX 77096 |
| Receiving water | WILLOW WATERHOLE BAYOU ABOVE TIDAL |
| Subwatershed | Keegans Bayou-Brays Bayou (HUC 120401040401) |
NPDES TXR1542RC: effluent limits and exceedances
HC 220122 - D139-00-00-X012 (NPDES TXR1542RC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1542RC: no pollutant row on file.
NPDES TXR1542RC: inspections, violations and enforcement
NPDES TXR1542RC (HC 220122 - D139-00-00-X012): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1542RC
NPDES TXR1542RC: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1542RC
NPDES TXR1542RC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.