Clean Water Act discharge permit · NPDES TXR1543WP
JOHN HAYES PHASE 2, El Paso, TX: NPDES TXR1543WP discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
JOHN HAYES PHASE 2, held by Jordan Foster Construction, LLC, holds NPDES permit TXR1543WP, which discharges to On-Site Retention Pond. EPA’s file records it issued December 2, 2025 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for JOHN HAYES PHASE 2: its NPDES ID, its permit type and status, its dates, its address in El Paso, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1543WP.
What stands out
- Its term runs 2 years and 93 days, December 2, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | JOHN HAYES PHASE 2 |
|---|---|
| Permittee as filed | Jordan Foster Construction, LLC |
| NPDES ID | TXR1543WP |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | December 2, 2025 |
| Expiration date | March 4, 2028 |
| Address | El Paso, TX 79928 |
| Receiving water | ON-SITE RETENTION POND |
| Subwatershed | Franklin Drain-Rio Grande (HUC 130401000203) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1543WP.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1543WP.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1543WP.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1543WP.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1543WP.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1543WP there.
JOHN HAYES PHASE 2, El Paso, Texas: Coverage under a general permit TXR1543WP, held by Jordan Foster Construction, LLC; Construction stormwater; Effective; issued December 2, 2025, term to March 4, 2028; discharges to ON-SITE RETENTION POND.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,334 were issued before TXR1543WP. Jordan Foster Construction, LLC holds 38 permits in Texas.
Other permits held by Jordan Foster Construction, LLC
- BORDERLAND EXPRESSWAY CSJ 0665-02-002, El Paso: TXR1501OK, issued 2023-09-19
- WILLIAMSON COUNTY FM 971, Granger: TXR1510NR, issued 2023-07-20
- EL PASO INTERNATIONAL AIRPORT, El Paso: TXR1512TQ, issued 2025-02-14
- CAMPO DEL SOL - UNIT 2B, El Paso: TXR1513OY, issued 2023-11-06
- WAC018501030, Belton: TXR1513SQ, issued 2024-11-04
- SL-360, Austin: TXR1517VY, issued 2025-09-24
- CAMPO DEL SOL, El Paso: TXR1517YA, issued 2026-04-22
- NW EARLY COLLEGE HIGH SCHOOL, El Paso: TXR1521XH, issued 2026-02-11
- VALLEY CHILE RD RECONSTRUCTION, Vinton: TXR1522WZ, issued 2026-01-13
- TXDOT SAT CSJ 0024-07-059, San Antonio: TXR1531VV, issued 2025-09-12
Coverages issued nearest TXR1543WP
- 2025-12-02: VISTA WEST II PHASE 3, Fort Worth: TXR1531WP, held by Gilco Contracting, Inc.
- 2025-12-02: PROJECT RISE, Oklaunion: TXR1532WP, held by RPM xConstruction, LLC
- 2025-12-02: EAST PFLUGERVILLE PARKWAY STREET AND DRAINAGE IMPROVEMENTS, Pflugerville: TXR1533WP, held by PATIN CONSTRUCTION LLC
- 2025-12-02: PEARL OAK HILL, Austin: TXR1534WP, held by Morgan Prl Construction LLC
- 2025-12-02: THE ROUNDHOUSE COTTAGES, Spring: TXR1542WP, held by Elite Construction And Engineering Services, LLC
- 2025-12-02: US 90 AT 77 A F 2025 924 0445-02-072, Hallettsville: TXR1547WP, held by Texas Department of Transportation
- 2025-12-02: SANG NGUYEN HALLETTSVILLE CHICKEN FARM, Hallettsville: TXR1548WP, held by Sang Nguyen
- 2025-12-02: DETENTION AND MASS GRADING TO SERVE LEGACY PARK ON HAFER ROA, Houston: TXR1550WP, held by North Houston Tandem Inc
- 2025-12-02: CROSSING AT GRAND MASON, Cypress: TXR1551WP, held by Long Lake, Ltd.
- 2025-12-02: CIBOLO CROSSING COMMERCIAL PHASE II, Cibolo: TXR1552WP, held by Joeris General Contractors, LLC
JOHN HAYES PHASE 2 among its neighbors
191 discharge permits are in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203); TXR1543WP is one. Its county: 532, 6 major; TXR1543WP is minor permit.
Other permits in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203)
- 0002-14-046 SOCORRO ROAD RM258, Socorro: TXR1569WB, minor, term to 2028-03-04
- 12426 PELLICANO, El Paso: TXR1549RC, minor, term to 2028-03-04
- 14448 SAM HAWKEN, El Paso: TXR1513PV, minor, term to 2028-03-04
- 14550 EICHELBERGER AVE, El Paso: TXR1526WV, minor, term to 2028-03-04
- 5750 DESERT WILLOW, El Paso: TXR1559NR, minor, term to 2028-03-04
- ADVANCED WATER PURIFICATION FACILITY, El Paso: TX0140929, minor, term to 2027-03-30
- ADVANCED WATER PURIFICATION FACILITY PROJECT, El Paso: TXR1531TJ, minor, term to 2028-03-04
- AMAZONCOM SERVICES ELP1, El Paso: TXR05FC05, minor, term to 2026-08-13
- AMERITRANS, El Paso: TXR05GT65, minor, term to 2026-08-13
- ANDRES AUTO SALES, El Paso: TXR05GA17, minor, term to 2026-08-13
Nearby on the register
- Discharge permits in El Paso
- Every permit record in El Paso, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The JOHN HAYES PHASE 2 storm water construction permit, held by Jordan Foster Construction, LLC, is one of 372 such permits in El Paso County, and it sits within the Franklin Drain-Rio Grande subwatershed, which holds 191 NPDES permits including this one. Of the 369 storm water construction permits in El Paso County, 66.4% were issued before this one, and the permit has no pollutants under a numeric limit and no effluent exceedances on file.