Clean Water Act discharge permit · NPDES TXR1544NX
AAON COIL PRODUCTS PH 2 FACILITY, Longview, TX: NPDES TXR1544NX discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
AAON COIL PRODUCTS PH 2 FACILITY, held by Arco Design/Build - Bts, LLC, holds NPDES permit TXR1544NX, which discharges to Long Creek. EPA’s file records it issued August 8, 2023 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for AAON COIL PRODUCTS PH 2 FACILITY: its NPDES ID, its permit type and status, its dates, its address in Longview, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1544NX.
What stands out
- Its term runs 4 years and 209 days, August 8, 2023 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | AAON COIL PRODUCTS PH 2 FACILITY |
|---|---|
| Permittee as filed | Arco Design/Build - Bts, LLC |
| NPDES ID | TXR1544NX |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 8, 2023 |
| Expiration date | March 4, 2028 |
| Address | Longview, TX 75602 |
| Receiving water | LONG CREEK |
| Subwatershed | Wood Creek-Sabine River (HUC 120100020601) |
| SIC | 1629 – Heavy Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1544NX.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1544NX.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1544NX.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1544NX.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1544NX.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1544NX there.
AAON COIL PRODUCTS PH 2 FACILITY, Longview, Texas: Coverage under a general permit TXR1544NX, held by Arco Design/Build - Bts, LLC; Construction stormwater; Effective; issued August 8, 2023, term to March 4, 2028; discharges to LONG CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 3,305 were issued before TXR1544NX.
Coverages issued nearest TXR1544NX
- 2023-08-08: LINK MULTI-FAMILY PHASE 1, Frisco: TXR1534NX, held by Stillwater Gc, LLC
- 2023-08-08: CINCO LAKES UNIT 9, San Antonio: TXR1536NX, held by M/I Homes Of San Antonio, LLC
- 2023-08-08: WINDING BROOK UNITS 5A 5B & 5C, San Antonio: TXR1537NX, held by M/I Homes Of San Antonio, LLC
- 2023-08-08: UNIVERSITY OF NORTH TEXAS FRISCO BRANCH CAMPUS BUILDING ONE, Frisco: TXR1542NX, held by J.T. Vaughn Construction, LLC
- 2023-08-08: KIPP - SOUTH CAMPUS, Houston: TXR1543NX, held by Turner Construction Company
- 2023-08-08: NUCOR STEEL TEXAS, Jewett: TXR1545NX, held by Nucor Corporation
- 2023-08-08: COULTER BUSINESS PARK, Bryan: TXR1547NX, held by Civil Constructors, Inc.
- 2023-08-08: HOWARD STREET UTILITY PROJECT, San Angelo: TXR1548NX, held by Darnell Construction, LLC
- 2023-08-08: PORTABLE CBP SERIAL NO 11330601, Waxahachie: TXR1549NX, held by Estrada Concrete Company, LLC
- 2023-08-08: RIDGELAND HILLS, Willis: TXR1551NX, held by Northtex Construction, LLC
AAON COIL PRODUCTS PH 2 FACILITY among its neighbors
22 discharge permits are in the Wood Creek-Sabine River subwatershed (HUC 120100020601); TXR1544NX is one.
Other permits in the Wood Creek-Sabine River subwatershed (HUC 120100020601)
- CHRISTIAN POLYTECHNIC UNIVERSITY CENTER, Longview: TXR1526YI, minor, term to 2028-03-04
- CITY OF LAKEPORT WWTP, Lakeport: TX0128856, minor, term to 2021-04-01
- EAST TEXAS REGIONAL AIRPORT RUNWAY 13-31 REHAB, Longview: TXR1556SD, minor, term to 2028-03-04
- EASTMAN CHEMICAL TEXAS OPERATIONS, City Of Longview: TX0000949, major, term to 2006-04-01
- EASTMAN TRACT, Longview: TXR1523OF, minor, term to 2028-03-04
- INVISTA POLYPROPYLENE ADMIN BUILDING, Longview: TXRNECN44, minor, term to 2026-08-13
- J-W POWER LONGVIEW MANUFACTURING, Longview: TXR05EX50, minor, term to 2026-08-13
- JOY GLOBAL LONGVIEW OPERATIONS, Longview: TXR05EZ90, minor, term to 2026-08-13
- KNOX LEE TO SOUTH TEXAS EASTMAN REBUILD, Longview: TXR1537TI, minor, term to 2028-03-04
- LEBUS INTERNATIONAL, Longview: TXR05GK49, minor, term to 2026-08-13
Nearby on the register
- Discharge permits in Longview
- Every permit record in Longview, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The AAON COIL PRODUCTS PH 2 FACILITY storm water construction permit in Longview is one of 6 such permits in the city, and 16.7% of those 6 permits have a violation on file. The permit sits in the Wood Creek-Sabine River subwatershed, which holds 22 NPDES permits including this one, and it has no pollutants under a numeric limit and no effluent exceedances on record.