NPDES TXR1546WS · Clean Water Act
CPR ADDITION PHASE 2, Flint, TX: NPDES TXR1546WS discharge permit, effluent exceedances, inspections, penalties
CPR ADDITION PHASE 2, Flint, Texas: General permit coverage TXR1546WS, held by Jacobe Brothers Construction, LLC.; Construction stormwater; Effective; issued December 11, 2025, term to March 4, 2028; discharges to ROSE BRANCH.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,561 were issued before TXR1546WS. Jacobe Brothers Construction, LLC. holds 2 permits in Texas.
Other permits held by Jacobe Brothers Construction, LLC.
- HALL CHEVROLET GMC CANTON, Canton: TXR1575YA, issued 2026-04-24
Coverages issued nearest TXR1546WS
- 2025-12-11: ELKTON TRAIL OFFICE BUILDINGS, Tyler: TXR1541WS, held by DPDW ENTERPRISES, LLC
- 2025-12-11: WESTPORT EARLY GRADING, Fort Worth: TXR1542WS, held by Conatser Construction Tx, LP
- 2025-12-11: GENERATION PARK PH1 DRAINAGE DETENTION POND G, Houston: TXR1543WS, held by Fellers & Clark, LP
- 2025-12-11: NAVARRO SOUTH ELEMENTARY SCHOOL, Seguin: TXR1544WS, held by Bartlett Cocke General Contractors, LLC
- 2025-12-11: WOODHAVEN WEST PHASE 1 MASS GRADING AND DETENTION, Magnolia: TXR1545WS, held by DNT Construction, LLC
- 2025-12-11: SANGER TOWN CENTER SOUTH FACILITY, Sanger: TXR1547WS, held by Sv Sanger, LLC
- 2025-12-11: VINCENT RESIDENCE, New Waverly: TXR1548WS, held by Blackoak Homes LLC
- 2025-12-11: SANDLIN HILLS ESTATES -PHASE 4, Springtown: TXR1549WS, held by TM Land Co., LP
- 2025-12-12: BUILDING NO 4 PASSPORT PARK WEST, Dfw Airport: TXR1550WS, held by F.A. Peinado, LLC
- 2025-12-12: QUIKTRIP STORE 7975, Raymondville: TXR1551WS, held by Wurzel Builders, Ltd.
CPR ADDITION PHASE 2 among its neighbors
18 discharge permits are in the Saline Creek-Copperas Creek subwatershed (HUC 120200010306); TXR1546WS is one. Its county: 241, 6 major; TXR1546WS is minor permit.
Other permits in the Saline Creek-Copperas Creek subwatershed (HUC 120200010306)
- ANTLER CREEK ESTATES, Bullard: TXR1577TG, minor, term to 2028-03-04
- BIG EDDY WWTP, Tyler: TX0137995, minor, term to 2025-01-21
- BLUE RIDGE PH 4, Bullard: TXR1571QS, minor, term to 2028-03-04
- CPR DEVELOPMENT, Flint: TXR1581UK, minor, term to 2028-03-04
- CUMBERLAND RIDGE SUBDIVISION, Bullard: TXR1563EK, minor, term to 2023-03-04
- J&K PROPERTIES, Flint: TXR1505MX, minor, term to 2028-03-04
- LINE S2 PH3 WELCH LANDFARM, Bullard: TXR1593SJ, minor, term to 2028-03-04
- LONGVIEW BRIDGE AND ROAD FLINT PIT, Flint: TXR1586VM, minor, term to 2028-03-04
- LOWE TRACTOR DEALERSHIP, Noonday: TXR1511VV, minor, term to 2028-03-04
- MURPHY RESIDENCE, Tyler: TXR1510TZ, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 84 days, December 11, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CPR ADDITION PHASE 2 |
|---|---|
| Permittee | Jacobe Brothers Construction, LLC. |
| NPDES ID | TXR1546WS |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 11, 2025 |
| Expires | March 4, 2028 |
| Address | Flint, TX 75762 |
| Receiving water | ROSE BRANCH |
| Subwatershed | Saline Creek-Copperas Creek (HUC 120200010306) |
NPDES TXR1546WS: effluent limits and exceedances
CPR ADDITION PHASE 2 (NPDES TXR1546WS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1546WS: no pollutant row on file.
NPDES TXR1546WS: inspections, violations and enforcement
NPDES TXR1546WS (CPR ADDITION PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1546WS
NPDES TXR1546WS: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1546WS
NPDES TXR1546WS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.