NPDES TXR1552QK · Clean Water Act
SBR CO2 SEQUESTRATION AND WWW PIPELINES, Odessa, TX: NPDES TXR1552QK discharge permit, effluent exceedances, inspections, penalties
SBR CO2 SEQUESTRATION AND WWW PIPELINES, Odessa, Texas: General permit coverage TXR1552QK, held by Holloman Corporation; Construction stormwater; Effective; issued April 2, 2024, term to March 4, 2028; discharges to UPPER PECOS RIVER NEAREST NAMED.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 6,621 were issued before TXR1552QK. Holloman Corporation holds 3 permits in Texas.
Other permits held by Holloman Corporation
- 1POINTFIVE P1 STRATOS PIPELINE SYSTEM, Odessa: TXR1527PI, issued 2023-12-17
- CAMINO REAL PIPELINE, San Antonio: TXR1561YF, issued 2026-05-12
Coverages issued nearest TXR1552QK
- 2024-04-01: 0914-05-204 CR 118 BRIDGE REPLACEMENT & NEW ROAD, Hutto: TXR1545QK, held by RELMCO, INC.
- 2024-04-01: CABLE BARRIER 0070-02-099, San Angelo: TXR1546QK, held by Scout 5 Construction LLC
- 2024-04-01: HUNTERS RANCH, San Antonio: TXR1547QK, held by DNT Construction, LLC
- 2024-04-02: SCOTTS BEND LIFT STATION, Baytown: TXR1550QK, held by Peltier Brothers Construction, LLC
- 2024-04-02: GRANGER POINTE SUBDIVISION, Conroe: TXR1551QK, held by Meritage Homes of Texas, LLC
- 2024-04-02: REPAIR AND REPLACE LINER WASTEWATER LAGOON 1 - LAUGHLIN AFB, Laughlin Afb: TXR1556QK, held by Ar6 Construction & Engineering, LLC
- 2024-04-02: PELICAN BAY ESTATES, Farmersville: TXR1557QK, held by Pelican Bay Estates
- 2024-04-02: EDGEBROOKE, Pflugerville: TXR1558QK, held by Clayton Properties Group, Inc.
- 2024-04-02: TRADITIONS SUBDIVISION, Bryan: TXR1562QK, held by Retreat & Co Texas LLC
- 2024-04-02: ABBOTTS FROZEN CUSTARD, San Antonio: TXR1564QK, held by 8203 Talley Road Property, LLC
SBR CO2 SEQUESTRATION AND WWW PIPELINES among its neighbors
Its county: 190, 1 major; TXR1552QK is minor permit.
Other permits in the county
- 100THLOOP 338 INTERSECTION, Odessa: TXR1508PK, minor, term to 2028-03-04
- 161 ROLLING WINDS, Odessa: TXR1544TZ, minor, term to 2028-03-04
- 1631 SOUTH JBS PARKWAY, Odessa: TXR1573RI, minor, term to 2028-03-04
- 1POINTFIVE P1 STRATOS PIPELINE SYSTEM, Odessa: TXR1527PI, minor, term to 2028-03-04
- 202 BELLA VISTA, Odessa: TXR1599PJ, minor, term to 2028-03-04
- 26 RIVER OAKS DRIVE, Odessa: TXR1580TT, minor, term to 2028-03-04
- 409 BELLA VISTA CIRCLE, Odessa: TXR1516PF, minor, term to 2028-03-04
- 46 ESTATES, Odessa: TXR1549OW, minor, term to 2028-03-04
- 5207 CONGRESS STREET, Odessa: TXR1519QN, minor, term to 2028-03-04
- 8 ROYAL MANOR, Odessa: TXR1576ZH, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 337 days, April 2, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SBR CO2 SEQUESTRATION AND WWW PIPELINES |
|---|---|
| Permittee | Holloman Corporation |
| NPDES ID | TXR1552QK |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 2, 2024 |
| Expires | March 4, 2028 |
| Address | Odessa, TX 79759 |
| Receiving water | UPPER PECOS RIVER NEAREST NAMED |
NPDES TXR1552QK: effluent limits and exceedances
SBR CO2 SEQUESTRATION AND WWW PIPELINES (NPDES TXR1552QK): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1552QK: no pollutant row on file.
NPDES TXR1552QK: inspections, violations and enforcement
NPDES TXR1552QK (SBR CO2 SEQUESTRATION AND WWW PIPELINES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1552QK
NPDES TXR1552QK: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1552QK
NPDES TXR1552QK: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.