NPDES TXR1553GT · Clean Water Act
COSTA PALMS RESORT, Rockport, TX: NPDES TXR1553GT discharge permit, effluent exceedances, inspections, penalties
COSTA PALMS RESORT, Rockport, Texas: General permit coverage TXR1553GT, held by Holligan Communities Inc; Construction stormwater; Administratively continued; issued October 1, 2021, term to March 4, 2023; discharges to COPANO & PUERTO BAY; Other Heavy and Civil Engineering Construction.
- April 24, 2023: Permit Violations - Violation Specified in Comment (ST6).
- September 8, 2022: Permit Violations - Violation Specified in Comment (ST6).
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 572 were issued before TXR1553GT.
Coverages issued nearest TXR1553GT
- 2021-10-01: WHITESTONE ESTATES PHASE 5 & 6, Parker: TXR1546GT, held by Hammett Excavation, Inc.
- 2021-10-01: THE ESTATES AT VINTAGE ADDITION, Lubbock: TXR1549GT, held by Steve Hill Incorporated
- 2021-10-01: CSJ 0086-02-030 ETC F 2021630 SH 359 WEBB, Aguilares: TXR1550GT, held by Anderson Columbia Co., Inc.
- 2021-10-01: PARKLAND VILLAGE ALL PHASES OF CONSTRUCTION, Cypress: TXR1551GT, held by Alcott, Inc
- 2021-10-01: 54 BLACK FORK CREEK OUTFALL SEWER CIPP LINER, Tyler: TXR1552GT, held by SAK CONSTRUCTION, LLC
- 2021-10-01: JUNIPER POINTE DEVELOPMENT, Graford: TXR1554GT, held by Foutsco Paving Company, LLC
- 2021-10-12: COSA PROJECT NO: 23-01599 NORTH NEW BRAUNFELS PH 1 (E HOUSTON TO BURLESON, San Antonio: TXR10F9UC, held by E-Z Bel Construction, LLC.
- 2021-11-01: CANVAS AT GRAND PRAIRIE, Grand Prairie: TXR1506HB, held by Canvas Gp Owner, LLC
- 2021-11-01: BLUE WING TRAILS SUBDIVISION UNIT 1, San Antonio: TXR1507HB, held by Northtex Construction, LLC
- 2021-11-01: TXDOT BMT CSJ 0200-16-020, Port Arthur: TXR1510HB, held by Texas Department of Transportation
COSTA PALMS RESORT among its neighbors
12 discharge permits are in the Salt Lake-Copano Bay subwatershed (HUC 121004050204); TXR1553GT is one. Its county: 22, 1 major; TXR1553GT is minor permit.
Other permits in the Salt Lake-Copano Bay subwatershed (HUC 121004050204)
- ARANSAS OAKS FISHERS COVE - HB, Aransas Pass: TXR1524YG, minor, term to 2028-03-04
- COPANO BAY CBP, Rockport: TXG111543, minor, term to 2016-11-07
- CSJ 0180-04-0120 SH 35, Rockport: TXR1567MV, minor, term to 2028-03-04
- CSJ 0180-04-120 SH 35, Rockport: TXR1548MW, minor, term to 2028-03-04
- DUN TRANSPORTATION PIPE YARD, Aransas Pass Tx: TXR1585WP, minor, term to 2028-03-04
- GULF ISLAND FABRICATION, Ingleside: TXR05FO52, minor, term to 2026-08-13
- KOKOMA SUBDIVISION 4, Rockport: TXR1593OM, minor, term to 2028-03-04
- KOKOMO SUBDIVISON PHASE 6, Rockport: TXR1508WK, minor, term to 2028-03-04
- MAREA PUD, Aransas Pass: TXR1581RR, minor, term to 2028-03-04
- PORT BAY WWTP, Aransas County: TX0131750, minor, term to 2014-03-01
What stands out
- Its term runs 1 year and 154 days, October 1, 2021 to March 4, 2023; the term ended 1,320 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on April 24, 2023, 1,269 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 2 events for it, from 2022 to 2023.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | COSTA PALMS RESORT |
|---|---|
| Permittee | Holligan Communities Inc |
| NPDES ID | TXR1553GT |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 1, 2021 |
| Expires | March 4, 2023 |
| Address | Rockport, TX 78382 |
| Receiving water | COPANO & PUERTO BAY |
| Subwatershed | Salt Lake-Copano Bay (HUC 121004050204) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1622 – Bridge, Tunnel, & Elevated Highway |
NPDES TXR1553GT: effluent limits and exceedances
COSTA PALMS RESORT (NPDES TXR1553GT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1553GT: no pollutant row on file.
NPDES TXR1553GT: inspections, violations and enforcement
NPDES TXR1553GT: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 24, 2023 | Permit Violations - Violation Specified in Comment | ST6 |
| September 8, 2022 | Permit Violations - Violation Specified in Comment | ST6 |
NPDES TXR1553GT (COSTA PALMS RESORT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1553GT
NPDES TXR1553GT: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1553GT
NPDES TXR1553GT: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.