NPDES TXR1553WK · Clean Water Act
AQUILLA LAKE WIND III, Malone, TX: NPDES TXR1553WK discharge permit, effluent exceedances, inspections, penalties
AQUILLA LAKE WIND III, Malone, Texas: General permit coverage TXR1553WK, held by Ferreira Power South, LLC; Construction stormwater; Effective; issued November 10, 2025, term to March 4, 2028; discharges to NAVARRO MILLS LAKE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 16,912 were issued before TXR1553WK. Ferreira Power South, LLC holds 4 permits in Texas.
Other permits held by Ferreira Power South, LLC
- CLAYTONVILLE 345 138 KV SWITCHYARD, Sweetwater: TXR1503VY, issued 2025-09-23
- INDIGO SOLAR INTERCONNECT, Sweetwater: TXR1509XN, issued 2026-03-04
- THROCKMORTON TRANSMISSION LINE, Haskell: TXR1537XK, issued 2026-02-20
Coverages issued nearest TXR1553WK
- 2025-11-10: CRESCENT BLUFF, Georgetown: TXR1545WK, held by Chesmar Homes, LLC
- 2025-11-10: BERRY CREEK, Georgetown: TXR1546WK, held by Chesmar Homes, LLC
- 2025-11-10: ELLA 45, Houston: TXR1547WK, held by HANOVER R.S. CONSTRUCTION LLC
- 2025-11-10: SUNTERRA LAKES, Brookshire: TXR1548WK, held by Astro Sunterra Lakes North, L.P.
- 2025-11-10: TRAILS AT COCHRAN RANCH, Waller: TXR1552WK, held by Northtex Construction, LLC
- 2025-11-10: TXDOT ODA CSJ 0292-04-063 WARD COUNTY, Monahans: TXR1554WK, held by Texas Department of Transportation
- 2025-11-10: MM NORTH BRIDGEPORT QUARRY, Chico: TXR1555WK, held by Martin Marietta Materials Southwest, LLC
- 2025-11-10: BLCCS INVESTEMENTS, San Antonio: TXR1556WK, held by BLCCS INVESTMENTS, LLC
- 2025-11-10: KYLE WWTP EXPANSION PHASE 2 EARLY WORKS PKG, Kyle: TXR1557WK, held by ARCHER WESTERN CONSTRUCTION, LLC
- 2025-11-10: TORO GRANDE SHARED IMPROVEMENTS, Cedar Park: TXR1558WK, held by Velar Development LLC
AQUILLA LAKE WIND III among its neighbors
1 discharge permits are in the Ash Creek-Navarro Mills Lake subwatershed (HUC 120301080109); TXR1553WK is one. Its county: 62, 1 major; TXR1553WK is minor permit.
What stands out
- Its term runs 2 years and 115 days, November 10, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AQUILLA LAKE WIND III |
|---|---|
| Permittee | Ferreira Power South, LLC |
| NPDES ID | TXR1553WK |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 10, 2025 |
| Expires | March 4, 2028 |
| Address | Malone, TX 76660 |
| Receiving water | NAVARRO MILLS LAKE |
| Subwatershed | Ash Creek-Navarro Mills Lake (HUC 120301080109) |
NPDES TXR1553WK: effluent limits and exceedances
AQUILLA LAKE WIND III (NPDES TXR1553WK): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1553WK: no pollutant row on file.
NPDES TXR1553WK: inspections, violations and enforcement
NPDES TXR1553WK (AQUILLA LAKE WIND III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1553WK
NPDES TXR1553WK: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1553WK
NPDES TXR1553WK: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.