NPDES TXR1557VS · Clean Water Act
FIREFLY POINTE - PHASE 3 STOCKPILE, Hutto, TX: NPDES TXR1557VS discharge permit, effluent exceedances, inspections, penalties
FIREFLY POINTE - PHASE 3 STOCKPILE, Hutto, Texas: General permit coverage TXR1557VS, held by Austin Engineering Co., Inc.; Construction stormwater; Effective; issued September 2, 2025, term to March 4, 2028; discharges to MUSTANG CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,542 were issued before TXR1557VS. Austin Engineering Co., Inc. holds 16 permits in Texas.
Other permits held by Austin Engineering Co., Inc.
- FRITZ - OFFSITE, Hutto: TXR1509TV, issued 2025-03-04
- CAPSTONE, Austin: TXR1510TA, issued 2024-12-13
- WILLIAMSON COUNTY MUD NO 44 WWTP PHASE 1, Weir: TXR1513YH, issued 2026-05-18
- VILLAGES AT SPANISH OAKS, Bee Cave: TXR1521VT, issued 2025-09-04
- VISTA MUD, Spicewood: TXR1524ST, issued 2024-11-15
- CR AUSTIN RESORT PHASE 1, Spicewood: TXR1533QI, issued 2024-03-25
- TRAVIS COUNTY WCID 10 WATER LINE EXTENSION, Austin: TXR1534YY, issued 2026-07-24
- TRAVIS COUNTY MUD NO 22 - ADDITIONAL DRIP FIELDS PHASE 2A, Bee Cave: TXR1539PX, issued 2024-02-13
- WTCPUA 1080 24 INCH TRANSMISSION MAIN SEGMENT B, Austin: TXR1556RC, issued 2024-06-10
- CITY OF ROUND ROCK GREENLAWN BLVD, Round Rock: TXR1558VS, issued 2025-09-02
Coverages issued nearest TXR1557VS
- 2025-09-02: LAKESONG DEV, Grand Prairie: TXR1551VS, held by Pulte Homes of Texas, L.P.
- 2025-09-02: MORNINGSTAR NORTH, Parker County: TXR1552VS, held by D.R. Horton - Texas, Ltd.
- 2025-09-02: NP90- BLDG 5, Houston: TXR1553VS, held by K. Low Construction LLC
- 2025-09-02: HIGH MEADOW WEST ROCKWOOD, Montgomery: TXR1554VS, held by Rockwood USA LLC
- 2025-09-02: PALO ALTO POINTE - UNIT 2, San Antonio: TXR1555VS, held by Indigo Construction, LLC
- 2025-09-02: CITY OF ROUND ROCK GREENLAWN BLVD, Round Rock: TXR1558VS, held by Austin Engineering Co., Inc.
- 2025-09-02: PASSPORT PARK WEST, Dfw Airport: TXR1559VS, held by Pci Construction, Inc.
- 2025-09-02: SUMMIT AT CENTER STAGE, Keller: TXR1561VS, held by Atmos Energy Corporation
- 2025-09-02: MADELEY CREEK PRESERVE SEC 1 & 2, Conroe: TXR1564VS, held by Beazer Homes Texas, L.P.
- 2025-09-02: WILDHORSE POD A PHASE 2A, Austin: TXR1566VS, held by Forestar (USA) Real Estate Group Inc.
FIREFLY POINTE - PHASE 3 STOCKPILE among its neighbors
84 discharge permits are in the Mustang Creek subwatershed (HUC 120702050405); TXR1557VS is one. Its county: 965, 17 major; TXR1557VS is minor permit.
Other permits in the Mustang Creek subwatershed (HUC 120702050405)
- 487 ACRE TAYLOR TRACT WWTP, Taylor: TX0146153
- AACTION OVERHEAD DOOR, Taylor: TXR1543RO, minor, term to 2028-03-04
- ALAMO CONCRETE PRODUCTS TAYLOR PLANT 60, Taylor: TXG110848, minor, term to 2021-11-07
- B & M TRACTOR PARTS, Taylor: TXR05GB39, minor, term to 2026-08-13
- BLUE SKY WATER RECLAMATION FACILITY, Taylor: TX0142646, major, term to 2027-09-16
- BULL BRANCH INTERCEPTOR IMPROVEMENTS, Taylor: TXR1533UG, minor, term to 2028-03-04
- CITY OF HUTTO FRAMESWITCH 20 MGD PUMPING STATION AND 3.0 MG, Taylor: TXR1567MT, minor, term to 2028-03-04
- CITY OF TAYLOR AIRPORT GRAVITY SEWER MAIN, Taylor: TXR1592WI, minor, term to 2028-03-04
- CIVITAS AT HUTTO WWTF, Hutto: TX0141933, minor, term to 2027-09-22
- COLT RECYCLING, Taylor: TXRNECQ65, minor, term to 2026-08-13
What stands out
- Its term runs 2 years and 184 days, September 2, 2025 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FIREFLY POINTE - PHASE 3 STOCKPILE |
|---|---|
| Permittee | Austin Engineering Co., Inc. |
| NPDES ID | TXR1557VS |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 2, 2025 |
| Expires | March 4, 2028 |
| Address | Hutto, TX 78634 |
| Receiving water | MUSTANG CREEK |
| Subwatershed | Mustang Creek (HUC 120702050405) |
| SIC | 1794 – Excavation Work |
NPDES TXR1557VS: effluent limits and exceedances
FIREFLY POINTE - PHASE 3 STOCKPILE (NPDES TXR1557VS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1557VS: no pollutant row on file.
NPDES TXR1557VS: inspections, violations and enforcement
NPDES TXR1557VS (FIREFLY POINTE - PHASE 3 STOCKPILE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1557VS
NPDES TXR1557VS: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1557VS
NPDES TXR1557VS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.