Velarion Records
Free: one email when NPDES TXR1561ZD changes. Unsubscribe any time.

NPDES TXR1561ZD · Clean Water Act

HA PHAM POULTRY FARM, Kosse, TX: NPDES TXR1561ZD discharge permit, effluent exceedances, inspections, penalties

HA PHAM POULTRY FARM, Kosse, Texas: General permit coverage TXR1561ZD, held by Ha Pham; Construction stormwater; Effective; issued August 14, 2026, term to March 4, 2028; discharges to HEADS CREEK.

Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 23,313 were issued before TXR1561ZD. Ha Pham holds 2 permits in Texas.

Other permits held by Ha Pham

Coverages issued nearest TXR1561ZD

HA PHAM POULTRY FARM among its neighbors

Its county: 43, 2 major; TXR1561ZD is minor permit.

Other permits in the county

What stands out

  • Its term runs 1 year and 203 days, August 14, 2026 to March 4, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityHA PHAM POULTRY FARM
PermitteeHa Pham
NPDES IDTXR1561ZD
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 14, 2026
ExpiresMarch 4, 2028
AddressKosse, TX 76653
Receiving waterHEADS CREEK

NPDES TXR1561ZD: effluent limits and exceedances

HA PHAM POULTRY FARM (NPDES TXR1561ZD): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES TXR1561ZD: no pollutant row on file.

NPDES TXR1561ZD: inspections, violations and enforcement

NPDES TXR1561ZD (HA PHAM POULTRY FARM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES TXR1561ZD

NPDES TXR1561ZD: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES TXR1561ZD

NPDES TXR1561ZD: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.