NPDES TXR1563OI · Clean Water Act
WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING, Georgetown, TX: NPDES TXR1563OI discharge permit, effluent exceedances, inspections, penalties
WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING, Georgetown, Texas: General permit coverage TXR1563OI, held by KB Home Lone Star Inc.; Construction stormwater; Effective; issued September 13, 2023, term to March 4, 2028; discharges to MCNUTT CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 3,878 were issued before TXR1563OI. KB Home Lone Star Inc. holds 49 permits in Texas.
Other permits held by KB Home Lone Star Inc.
- THE PRESERVE PHASE 1, Justin: TXR1501NZ, issued 2023-08-11
- OLYMPIA FALLS SEC 4, Fresno: TXR1501UU, issued 2025-06-02
- ESPINO TRACT 16 INCH OFFSITE WATER LINE, San Antonio: TXR1503UU, issued 2025-06-02
- ESPINO TRACT UNIT 1, San Antonio: TXR1504UU, issued 2025-06-02
- WEST BASTROP VILLAGE, Bastrop: TXR1508YO, issued 2026-06-12
- GOLDEN HIDDEN TRAILS PHASE I, Belton: TXR1510SC, issued 2024-09-11
- SIERRA VISTA, Aledo: TXR1512TS, issued 2025-02-21
- SWEETGRASS, Crosby: TXR1513XB, issued 2026-01-20
- ROSS ROAD SUBDIVISION, Austin: TXR15166S, issued 2018-10-01
- HOLLEY-SMITH PHASE 1A & 1B, Manor: TXR1517MQ, issued 2023-04-27
Coverages issued nearest TXR1563OI
- 2023-09-13: MCCRARY TRACT SUBDIVISION UNIT 27, San Antonio: TXR1550OI, held by Ecm Development, LLC
- 2023-09-13: BROWNSVILLE COUNTRY CLUB, Brownsville: TXR1553OI, held by Guzman & Munoz Engineering And Surveying, Inc.
- 2023-09-13: FOLEY ROAD LAKE HOUSTON SILTSAND REMOVAL, Crosby: TXR1555OI, held by DRC Emergency Services, LLC
- 2023-09-13: RESIDENTIAL ZONE K8 NORTH & L8WEST, Plano: TXR1557OI, held by Cam-Crete Contracting, Inc.
- 2023-09-13: QUINTA MAZATLAN, Mcallen: TXR1560OI, held by SpawGlass Contractors, Inc.
- 2023-09-13: VANGUARD SUBSTATION AND LINE PROJECT, Mesquite: TXR1564OI, held by Oncor Electric Delivery Company LLC
- 2023-09-13: BENTWOOD, San Angelo: TXR1578OI, held by Spider Homes, LLC
- 2023-09-13: LITTLE ELM RETAIL CENTER, Little Elm: TXR1585OI, held by HEIGHTS VENTURE ARCHITECTS L.L.P.
- 2023-09-13: INDIAN SPRING DETENTION, Crosby: TXR1586OI, held by Norkon Construction, LLC
- 2023-09-14: OAKHURST 2023 - PH2 DRAINAGE IMPROVEMENTS, Porter: TXR1502OJ, held by Precise Services, Inc.
WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING among its neighbors
111 discharge permits are in the Cottonwood Creek-Brushy Creek subwatershed (HUC 120702050404); TXR1563OI is one. Its county: 965, 17 major; TXR1563OI is minor permit.
Other permits in the Cottonwood Creek-Brushy Creek subwatershed (HUC 120702050404)
- 0914-05-204 CR 118 BRIDGE REPLACEMENT & NEW ROAD, Hutto: TXR1545QK, minor, term to 2028-03-04
- 0914-05-204 CR 118 BRIDGE REPLACEMENT & NEW ROAD, Hutto: TXR1590PJ, minor, term to 2028-03-04
- ALPHA FUEL C-STORE, Hutto: TXR1568TV, minor, term to 2028-03-04
- ALTA ED SCHMIDT APARTMENTS, Hutto: TXR1548TS, minor, term to 2028-03-04
- AUSTIN WOOD RECYCLING INC - HUTTO, Hutto: TXR05FW17, minor, term to 2026-08-13
- AVERY CENTRE EAST - PH 1 SEC 4 & 5, Round Rock: TXR1504NR, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK LIFT STATION AND FORCE MAINS, Hutto: TXR1575ZB, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK PHASES 1 2 3 AND 4, Hutto: TXR1568ZA, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK PHASES 1 2 3 AND 4, Hutto: TXR1576ZB, minor, term to 2028-03-04
- BRUSHY CREEK INDUSTRIAL PARK LOT 4C, Hutto: TXR1584QX, minor, term to 2028-03-04
What stands out
- Its term runs 4 years and 173 days, September 13, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING |
|---|---|
| Permittee | KB Home Lone Star Inc. |
| NPDES ID | TXR1563OI |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 13, 2023 |
| Expires | March 4, 2028 |
| Address | Georgetown, TX 78626 |
| Receiving water | MCNUTT CREEK |
| Subwatershed | Cottonwood Creek-Brushy Creek (HUC 120702050404) |
NPDES TXR1563OI: effluent limits and exceedances
WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING (NPDES TXR1563OI): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1563OI: no pollutant row on file.
NPDES TXR1563OI: inspections, violations and enforcement
NPDES TXR1563OI (WICKER PLACE PHASES 1 & 2 AND PHASE 3 GRADING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1563OI
NPDES TXR1563OI: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1563OI
NPDES TXR1563OI: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.