NPDES TXR1566OJ · Clean Water Act
DOUBLE EAGLE SECTION 5 PHASE B, Cedar Creek, TX: NPDES TXR1566OJ discharge permit, effluent exceedances, inspections, penalties
DOUBLE EAGLE SECTION 5 PHASE B, Cedar Creek, Texas: General permit coverage TXR1566OJ, held by Meritage Homes of Texas, LLC; Construction stormwater; Effective; issued September 18, 2023, term to March 4, 2028; discharges to DRY CREEK; Highway, Street, and Bridge Construction.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 3,929 were issued before TXR1566OJ. Meritage Homes of Texas, LLC holds 88 permits in Texas.
Other permits held by Meritage Homes of Texas, LLC
- WESTOVER VILLAGE TOWNHOMES, San Antonio: TXR1501XY, issued 2026-04-14
- SOUTHWINDS SEC 5 WS&D, Baytown: TXR1502PB, issued 2023-11-16
- STONEHAVEN PH 3, Seagoville: TXR1503VC, issued 2025-07-01
- EASTRIDGE PH 4, Princeton: TXR1504VC, issued 2025-07-01
- CONTESSA, New Braunfels: TXR1504VI, issued 2025-07-23
- KALLISON RANCH, San Antonio: TXR1506ST, issued 2024-11-14
- TURNERS CROSSING SOUTH - PHASE 2, Austin: TXR1506UF, issued 2025-04-08
- LAKEHAVEN PH 8, Farmersville: TXR1506VR, issued 2025-08-26
- TURNERS CROSSING NORTH TOWNHOME, Austin: TXR1507NX, issued 2023-08-07
- MAGNOLIA CREEK, Pearland: TXR1508TZ, issued 2025-03-18
Coverages issued nearest TXR1566OJ
- 2023-09-17: PROMINENCE SQUARE, Denton: TXR1556OJ, held by Henry Rife Construction, Inc.
- 2023-09-18: BENS BRANCH TRIBUTARY NO 2 DRAINAGE IMPRVTS, Porter: TXR1561OJ, held by Sterling Site Services LLC
- 2023-09-18: SOLTERRA - PH 1C 1E & 1D, Mesquite: TXR1563OJ, held by Dfh Coventry, LLC
- 2023-09-18: WILLIAM RANCH PROPERTY, Copper Canyon: TXR1564OJ, held by Precision Concrete and Excavation LLC
- 2023-09-18: SOUTHERN POINTE SUBDIVISION DR HORTON OFFICE, College Station: TXR1565OJ, held by Jacody Construction, LP
- 2023-09-18: MONTANA VISTA HS SITE IMPROVEMENTS, El Paso: TXR1568OJ, held by AO GENERAL CONTRACTOR, INC.
- 2023-09-18: BLUE TIDE ENVIRONMENTAL BAYTOWN, Baytown: TXR1569OJ, held by Shackelford Construction And Hauling LLC.
- 2023-09-18: BLUE TIDE ENVIRONMENTAL BAYTOWN, Baytown: TXR1570OJ, held by Shackelford Construction And Hauling LLC.
- 2023-09-18: FALLBROOK SUBDIVISION DRAINAGE IMPROVEMENTS, Houston: TXR1572OJ, held by Specialty Construction Tx, LLC
- 2023-09-18: CORRIDOR C - SH29 BYPASS EXTENSION, Georgetown: TXR1573OJ, held by Williamson County
DOUBLE EAGLE SECTION 5 PHASE B among its neighbors
76 discharge permits are in the Red Gully Creek-Dry Creek subwatershed (HUC 120903010109); TXR1566OJ is one. Its county: 222, 5 major; TXR1566OJ is minor permit.
Other permits in the Red Gully Creek-Dry Creek subwatershed (HUC 120903010109)
- AERE APARTMENTS AT EASTON PARK, Austin: TXR1571YF, minor, term to 2028-03-04
- AIRFIELD 130, Del Valle: TXR1540OT, minor, term to 2028-03-04
- AMERICAN MINERAL, Del Valle: TXR05GT02, minor, term to 2026-08-13
- AUSTIN SURF CLUB, Del Valle: TXR1533SC, minor, term to 2028-03-04
- BASTROP ELEMENTARY SCHOOL 10, Cedar Creek: TXR1562XT, minor, term to 2028-03-04
- BASTROP ENERGY CENTER, Cedar Creek: TXR1509XE, minor, term to 2028-03-04
- BGICO LLC, Buda: TX0146277, minor, term to 2031-01-29
- CAPITAL CONCRETE PRODUCTS, Del Valle: TXR05FN13, minor, term to 2026-08-13
- CEDAR CREEK WWTP, Bastrop: TX0144207, minor, term to 2031-05-13
- COLTON TO ELROY T658 TRANSMISSION LINE OVERHAUL, Austin: TXR1557XK, minor, term to 2028-03-04
What stands out
- Its term runs 4 years and 168 days, September 18, 2023 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DOUBLE EAGLE SECTION 5 PHASE B |
|---|---|
| Permittee | Meritage Homes of Texas, LLC |
| NPDES ID | TXR1566OJ |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 18, 2023 |
| Expires | March 4, 2028 |
| Address | Cedar Creek, TX 78602 |
| Receiving water | DRY CREEK |
| Subwatershed | Red Gully Creek-Dry Creek (HUC 120903010109) |
| NAICS | 237310 – Highway, Street, and Bridge Construction |
| SIC | 1521 – Single-Family Housing Construction |
NPDES TXR1566OJ: effluent limits and exceedances
DOUBLE EAGLE SECTION 5 PHASE B (NPDES TXR1566OJ): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1566OJ: no pollutant row on file.
NPDES TXR1566OJ: inspections, violations and enforcement
NPDES TXR1566OJ (DOUBLE EAGLE SECTION 5 PHASE B): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1566OJ
NPDES TXR1566OJ: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1566OJ
NPDES TXR1566OJ: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.