NPDES TXR1570XO · Clean Water Act
EASTSIDE REGIONAL PARK PHASE 2, El Paso, TX: NPDES TXR1570XO discharge permit, effluent exceedances, inspections, penalties
EASTSIDE REGIONAL PARK PHASE 2, El Paso, Texas: General permit coverage TXR1570XO, held by Gracen Engineering & Construction, Inc.; Construction stormwater; Effective; issued March 10, 2026, term to March 4, 2028; discharges to ONSITE RETENTION POND.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,490 were issued before TXR1570XO.
Coverages issued nearest TXR1570XO
- 2026-03-10: BIRDSONG PH 4, Mansfield: TXR1502XP, held by First Texas Homes, Inc.
- 2026-03-10: CIVTAS AT ALVARADO PHASE 1, Alvarado: TXR1566XO, held by INDIE CATCH LLC
- 2026-03-10: SUN CHASE AKA REVELRY, Del Valle: TXR1567XO, held by Drb Group Texas, LLC
- 2026-03-10: HARMONY SCIENCE ACADEMY-KATY ADDITION & SITE IMPS, Katy: TXR1568XO, held by Sterling Structures, Inc.
- 2026-03-10: PREP OF HIGHLAND VILLAGE, Georgetown: TXR1569XO, held by Double Diamond Construction, Inc.
- 2026-03-10: CONCRETE BATCH PLANT SUPPORTING ARBORENTUM PH 1, Terrel: TXR1571XO, held by RPM xConstruction, LLC
- 2026-03-10: 8201 RIDGEPOINT, Irving: TXR1572XO, held by The Conlan Company
- 2026-03-10: CYPRESS STATION, Houston: TXR1573XO, held by Ars Construction LLC
- 2026-03-10: CONCRETE BATCH PLANT SUPPORTING BRYSON RANCH PH 1A, Pilot Point: TXR1574XO, held by RPM xConstruction, LLC
- 2026-03-10: CONCRETE BATCH PLANT SUPPORTING BRYSON RANCH 1B, Pilot Point: TXR1575XO, held by RPM xConstruction, LLC
EASTSIDE REGIONAL PARK PHASE 2 among its neighbors
191 discharge permits are in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203); TXR1570XO is one. Its county: 532, 6 major; TXR1570XO is minor permit.
Other permits in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203)
- 0002-14-046 SOCORRO ROAD RM258, Socorro: TXR1569WB, minor, term to 2028-03-04
- 12426 PELLICANO, El Paso: TXR1549RC, minor, term to 2028-03-04
- 14448 SAM HAWKEN, El Paso: TXR1513PV, minor, term to 2028-03-04
- 14550 EICHELBERGER AVE, El Paso: TXR1526WV, minor, term to 2028-03-04
- 5750 DESERT WILLOW, El Paso: TXR1559NR, minor, term to 2028-03-04
- ADVANCED WATER PURIFICATION FACILITY, El Paso: TX0140929, minor, term to 2027-03-30
- ADVANCED WATER PURIFICATION FACILITY PROJECT, El Paso: TXR1531TJ, minor, term to 2028-03-04
- AMAZONCOM SERVICES ELP1, El Paso: TXR05FC05, minor, term to 2026-08-13
- AMERITRANS, El Paso: TXR05GT65, minor, term to 2026-08-13
- ANDRES AUTO SALES, El Paso: TXR05GA17, minor, term to 2026-08-13
What stands out
- Its term runs 1 year and 360 days, March 10, 2026 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | EASTSIDE REGIONAL PARK PHASE 2 |
|---|---|
| Permittee | Gracen Engineering & Construction, Inc. |
| NPDES ID | TXR1570XO |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 10, 2026 |
| Expires | March 4, 2028 |
| Address | El Paso, TX 79938 |
| Receiving water | ONSITE RETENTION POND |
| Subwatershed | Franklin Drain-Rio Grande (HUC 130401000203) |
| SIC | 1542 – Nonresidential Construction |
NPDES TXR1570XO: effluent limits and exceedances
EASTSIDE REGIONAL PARK PHASE 2 (NPDES TXR1570XO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1570XO: no pollutant row on file.
NPDES TXR1570XO: inspections, violations and enforcement
NPDES TXR1570XO (EASTSIDE REGIONAL PARK PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1570XO
NPDES TXR1570XO: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1570XO
NPDES TXR1570XO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.