Velarion Records
Free: one email when NPDES TXR1571TX changes. Unsubscribe any time.

NPDES TXR1571TX · Clean Water Act

FRONTERA SUBSTATION EXPANSION PROJECT, Mission, TX: NPDES TXR1571TX discharge permit, effluent exceedances, inspections, penalties

FRONTERA SUBSTATION EXPANSION PROJECT, Mission, Texas: General permit coverage TXR1571TX, held by AEP Texas Inc.; Construction stormwater; Effective; issued March 12, 2025, term to March 4, 2028; discharges to DRAINAGE DITCHES FLOWING INTO ARROYO COLORADO ABOV.

Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 12,128 were issued before TXR1571TX. AEP Texas Inc. holds 50 permits in Texas.

Other permits held by AEP Texas Inc.

Coverages issued nearest TXR1571TX

FRONTERA SUBSTATION EXPANSION PROJECT among its neighbors

185 discharge permits are in the Llano Grande Lake-Arroyo Colorado subwatershed (HUC 121102080100); TXR1571TX is one. Its county: 439, 16 major; TXR1571TX is minor permit.

Other permits in the Llano Grande Lake-Arroyo Colorado subwatershed (HUC 121102080100)

What stands out

  • Its term runs 2 years and 358 days, March 12, 2025 to March 4, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFRONTERA SUBSTATION EXPANSION PROJECT
PermitteeAEP Texas Inc.
NPDES IDTXR1571TX
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 12, 2025
ExpiresMarch 4, 2028
AddressMission, TX 78572
Receiving waterDRAINAGE DITCHES FLOWING INTO ARROYO COLORADO ABOV
Receiving water impaired303(D) Listed
SubwatershedLlano Grande Lake-Arroyo Colorado (HUC 121102080100)

NPDES TXR1571TX: effluent limits and exceedances

FRONTERA SUBSTATION EXPANSION PROJECT (NPDES TXR1571TX): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES TXR1571TX: no pollutant row on file.

NPDES TXR1571TX: inspections, violations and enforcement

NPDES TXR1571TX (FRONTERA SUBSTATION EXPANSION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES TXR1571TX

NPDES TXR1571TX: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES TXR1571TX

NPDES TXR1571TX: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.