Velarion Records
Free: one email when NPDES TXR1572YZ changes. Unsubscribe any time.

NPDES TXR1572YZ · Clean Water Act

WOODROW ROAD PHASE 2, Lubbock, TX: NPDES TXR1572YZ discharge permit, effluent exceedances, inspections, penalties

WOODROW ROAD PHASE 2, Lubbock, Texas: General permit coverage TXR1572YZ, held by Lubbock County; Construction stormwater; Effective; issued July 30, 2026, term to March 4, 2028; discharges to 1241A.

Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 22,937 were issued before TXR1572YZ.

Coverages issued nearest TXR1572YZ

WOODROW ROAD PHASE 2 among its neighbors

Its county: 577, 2 major; TXR1572YZ is minor permit.

Other permits in the county

What stands out

  • Its term runs 1 year and 218 days, July 30, 2026 to March 4, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityWOODROW ROAD PHASE 2
PermitteeLubbock County
NPDES IDTXR1572YZ
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 30, 2026
ExpiresMarch 4, 2028
AddressLubbock, TX 79423
Receiving water1241A

NPDES TXR1572YZ: effluent limits and exceedances

WOODROW ROAD PHASE 2 (NPDES TXR1572YZ): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES TXR1572YZ: no pollutant row on file.

NPDES TXR1572YZ: inspections, violations and enforcement

NPDES TXR1572YZ (WOODROW ROAD PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES TXR1572YZ

NPDES TXR1572YZ: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES TXR1572YZ

NPDES TXR1572YZ: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.