NPDES TXR1574RV · Clean Water Act
PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT, Poteet, TX: NPDES TXR1574RV discharge permit, effluent exceedances, inspections, penalties
PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT, Poteet, Texas: General permit coverage TXR1574RV, held by Qro Mex Construction Company, Inc.; Construction stormwater; Effective; issued August 19, 2024, term to March 4, 2028; discharges to ATASCOSA RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 8,698 were issued before TXR1574RV. Qro Mex Construction Company, Inc. holds 12 permits in Texas.
Other permits held by Qro Mex Construction Company, Inc.
- KENDALL CO WATER CONTROL IMPROVEMENT DISTRICT 3A OFFSITE WA, Boerne: TXR1505TE, issued 2025-01-03
- CEDAR STREET WATERLINE-SH46 WATERLINE EXPANSION PROJECT, Seguin: TXR1509SH, issued 2024-09-30
- LUENSMANN OFF-SITE WATER MAIN EXTENSION PHASE 1, San Antonio: TXR1523PO, issued 2024-01-16
- LUENSMANN OFF-SITE WATER MAIN EXTENSION PHASE 2, San Antonio: TXR1527RI, issued 2024-06-28
- PH IV EAST KERR CENTER POINT WASTEWATER COLLECTION, Center Point: TXR1543ZC, issued 2026-08-10
- EAST CENTRAL SUD - USDA WATER SYSTEM IMPROVEMENTS, San Antonio: TXR1579PD, issued 2023-11-29
- 2023 WATER MAIN REPLACEMENT PROJECT 5, San Antonio: TXR1586WT, issued 2025-12-17
- SAWS HIGDON CROSSING OFF-SITE SEWER, San Antonio: TXR1590OP, issued 2023-10-10
- SAWS 2020 CMOM PACKAGE 3 -APPLEWHITE, San Antonio: TXR1593NC, issued 2023-06-08
- SAWS GALLAGHER TRACT 16 WATER EXTENSION, San Antonio: TXR1594NC, issued 2023-06-08
Coverages issued nearest TXR1574RV
- 2024-08-19: EVERHOME SUITES, San Antonio: TXR1569RV, held by Stark Contracting, LLC
- 2024-08-19: PRAIRIELAND VILLAGE SECTION 29 AMENITY, Hockley: TXR1570RV, held by D.L. Meacham, L.P.
- 2024-08-19: BRACKENRIDGE HIGH SCHOOL, San Antonio: TXR1571RV, held by Joeris General Contractors, LLC
- 2024-08-19: SUNSHINE TRAILS - OFFSITE, San Antonio: TXR1572RV, held by M5 Utilities LLC
- 2024-08-19: DITCH WITCH SITE REDEVELOPMENT, Selma: TXR1573RV, held by Mht Constructors, LLC
- 2024-08-19: LAKELINE STATION MULTIFAMILY NORTH & SOUTH, Austin: TXR1576RV, held by Cadence McShane Construction Company LLC
- 2024-08-19: CITY OF LA MARQUE 16 WATER LINE ON MAIN STREET, La Marque: TXR1577RV, held by V&S Construction Company LLC
- 2024-08-19: MCCARTY PARK PHASE 1, San Marcos: TXR1578RV, held by David E. Harvey Builders, Inc.
- 2024-08-19: KABITA DEKA VET, Dripping Springs: TXR1579RV, held by Flintrock Realty Services, LLC
- 2024-08-19: PINE TREE ISD-BASEBALL FACILITY & BAND HALL RENOVA, Longview: TXR1580RV, held by Pine Tree ISD
PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT among its neighbors
6 discharge permits are in the Palo Alto Creek subwatershed (HUC 121101100202); TXR1574RV is one. Its county: 44, 1 major; TXR1574RV is minor permit.
Other permits in the Palo Alto Creek subwatershed (HUC 121101100202)
- CAROUSEL SPECIALTY PRODUCTS, Poteet: TXR05FS42, minor, term to 2026-08-13
- FRONTIER ACCESS - SOUTH SAN ANTONIO, Poteet: TXR05GQ36, minor, term to 2026-08-13
- J&S MATERIALS DBA MADDEN MATERIALS, Von Ormy: TXR05DX15, minor, term to 2026-08-13
- TXDOT SAT CSJ 0613-01-070, San Antonio: TXR1512VK, minor, term to 2028-03-04
- TXDOT SAT CSJ 0613-01-070, San Antonio: TXR1545VK, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 198 days, August 19, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT |
|---|---|
| Permittee | Qro Mex Construction Company, Inc. |
| NPDES ID | TXR1574RV |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 19, 2024 |
| Expires | March 4, 2028 |
| Address | Poteet, TX 78065 |
| Receiving water | ATASCOSA RIVER |
| Subwatershed | Palo Alto Creek (HUC 121101100202) |
NPDES TXR1574RV: effluent limits and exceedances
PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT (NPDES TXR1574RV): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1574RV: no pollutant row on file.
NPDES TXR1574RV: inspections, violations and enforcement
NPDES TXR1574RV (PRIMROSE OAKS SOUTH WATER MAIN REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1574RV
NPDES TXR1574RV: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1574RV
NPDES TXR1574RV: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.