Clean Water Act discharge permit · NPDES TXR1580XB
PIRKEY TO SCOTTVILLE, Pirkey, TX: NPDES TXR1580XB discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
PIRKEY TO SCOTTVILLE, held by Southwestern Electric Power Company, holds NPDES permit TXR1580XB, which discharges to Brady Branch Reservoir. EPA’s file records it issued January 22, 2026 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for PIRKEY TO SCOTTVILLE: its NPDES ID, its permit type and status, its dates, its address in Pirkey, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1580XB.
What stands out
- Its term runs 2 years and 42 days, January 22, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | PIRKEY TO SCOTTVILLE |
|---|---|
| Permittee as filed | Southwestern Electric Power Company |
| NPDES ID | TXR1580XB |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 22, 2026 |
| Expiration date | March 4, 2028 |
| Address | Pirkey, TX 75650 |
| Receiving water | BRADY BRANCH RESERVOIR |
| Subwatershed | Rogers Lake-Sabine River (HUC 120100020608) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1580XB.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1580XB.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1580XB.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1580XB.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1580XB.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1580XB there.
PIRKEY TO SCOTTVILLE, Pirkey, Texas: Coverage under a general permit TXR1580XB, held by Southwestern Electric Power Company; Construction stormwater; Effective; issued January 22, 2026, term to March 4, 2028; discharges to BRADY BRANCH RESERVOIR.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 18,316 were issued before TXR1580XB. Southwestern Electric Power Company holds 19 permits in Texas.
Other permits held by Southwestern Electric Power Company
- AEP KNOX LEE POWER PLANT, Longview: TXR05FC61, issued 2021-11-18
- AEP WELSH POWER PLANT, Pittsburg: TXR05FC62, issued 2021-10-26
- PIRKEY POWER PLANT DEMOLITION AND SITE DEVELOPMENT, Hallsville: TXR1511OK, issued 2023-09-19
- BECKVILLE TO ROCK HILL, Beckville: TXR1530PV, issued 2024-02-06
- JEFFERSON-SUPERIOR-HB4150, Jefferson: TXR1533UR, issued 2025-05-21
- KNOX LEE TO SOUTH TEXAS EASTMAN REBUILD, Longview: TXR1537TI, issued 2025-01-20
- PRIEFERT EXTENSION, Mt Pleasant: TXR1542YU, issued 2026-07-09
- JEFFERSON TO SUPERIOR, Jefferson: TXR1545WQ, issued 2025-12-05
- PILGRIMS REC TO QUITMAN, Alba: TXR1549WT, issued 2025-12-16
- GRAND SALINE - PILGRIMS REC, Grand Saline: TXR1550WT, issued 2025-12-16
Coverages issued nearest TXR1580XB
- 2026-01-22: ALLORA FALLBROOK, Houston: TXR1575XB, held by Maple Multi-Family TX Contractor, L.L.C.
- 2026-01-22: RIVER RIDGE COMMERCIAL - WEST OF SPRING CREEK, Crandall: TXR1576XB, held by Alltex Site Services LLC
- 2026-01-22: HAM BRANCH AQUATIC HABITAT MITIGATION, Fort Worth: TXR1577XB, held by Hgs, LLC
- 2026-01-22: FM 1314 MAVERA, Conroe: TXR1578XB, held by Construction Contract Services, Inc.
- 2026-01-22: WOODLAND PARK SUBDIVISION, College Station: TXR1579XB, held by Magruder Homes, LP
- 2026-01-22: CEDAR CREEK AT MAPLE, Abiline: TXR1581XB, held by National Home Corporation.
- 2026-01-22: CALLISTO II ENERGY CENTER, Houston: TXR1582XB, held by EPC Services Company
- 2026-01-22: THE ENCLAVE AT LAKE BELTON, Moody: TXR1583XB, held by Wright Builders II, Ltd.
- 2026-01-22: ENCLAVE OF TABOR RANCH, Denton County: TXR1584XB, held by Tabor 380 Development, LLC
- 2026-01-22: SHERRY POINTE, Arlington: TXR1585XB, held by Spring Valley Construction Company
PIRKEY TO SCOTTVILLE among its neighbors
8 discharge permits are in the Rogers Lake-Sabine River subwatershed (HUC 120100020608); TXR1580XB is one. Its county: 54, 3 major; TXR1580XB is minor permit.
Other permits in the Rogers Lake-Sabine River subwatershed (HUC 120100020608)
- C LILES TRUCKING, Tatum: TXR05FR15, minor, term to 2026-08-13
- EASTON CONCRETE, Longview: TXG113202, minor, term to 2026-11-06
- HARRISON COUNTY POWER PROJECT, Marshall: TX0124516, minor, term to 2021-04-01
- MARSHALL PLANT, Marshall: TX0000710, major, term to 2021-04-01
- PIRKEY POWER PLANT DEMOLITION AND SITE DEVELOPMENT, Hallsville: TXR1511OK, minor, term to 2028-03-04
- SOUTH HALLSVILLE 1 MINE RUSK AREA, Tatum: TX0132683, minor, term to 2021-04-01
- WHARTON CHEMICAL COMPLEX, Hungerford: TX0086363, minor, term to 2024-09-20
Nearby on the register
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The Pirkey to Scottville storm water construction permit (NPDES ID TXR1580XB), issued to Southwestern Electric Power Company for Pirkey, Harrison County, Texas, is one of 15 storm water construction permits in Harrison County on EPA's NPDES register, this one included. Among those 15, 73.3% were issued earlier than this permit, and 0.0% carry a violation on file. The permit sits within the Rogers Lake-Sabine River subwatershed, where 8 NPDES permits, this one included, are listed.