NPDES TXR1580XG · Clean Water Act
DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION, Dallas, TX: NPDES TXR1580XG discharge permit, effluent exceedances, inspections, penalties
DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION, Dallas, Texas: General permit coverage TXR1580XG, held by Dallas-Ft. Worth International Airport Board; Construction stormwater; Effective; issued February 10, 2026, term to March 4, 2028; discharges to GRAPEVINE CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 18,750 were issued before TXR1580XG. Dallas-Ft. Worth International Airport Board holds 27 permits in Texas.
Other permits held by Dallas-Ft. Worth International Airport Board
- DALLAS-FT WORTH INTERNATIONAL AIRPORT BOARD MS4, Tarrant County: TXR040044, issued 2023-12-07
- DALLAS-FORT WORTH INTERNATIONAL AIRPORT, Dfw Airport: TXR05FB18, issued 2021-10-04
- SPENT AIRCRAFT DEICING FLUID STORAGE AND TREATMENT PROGRAM, Euless: TXR1502RM, issued 2024-07-15
- SE PARKING LOT REHABILITATION AND IMPROVEMENT, Dallas: TXR1502UO, issued 2025-05-12
- DFW CTAE TERMINAL C, Dfw Airport: TXR1506QS, issued 2024-04-29
- DFW AIRPORT SUPPLEMENTAL ECUP EXPANSION, Dfw Airport: TXR1506TL, issued 2025-01-29
- DALLAS FORT WORTH INTL AIRPORT, Dallas: TXR1521MK, issued 2023-04-10
- DFW AIRPORT ROADWAY AND BRIDGE, Dfw Airport: TXR1521QK, issued 2024-04-01
- DFW CTAE TERMINAL A, Dfw Airport: TXR1522QZ, issued 2024-05-28
- DFW AIRPORT ARFF EAST BUILDING, Dfw Airport: TXR1529QI, issued 2024-03-25
Coverages issued nearest TXR1580XG
- 2026-02-10: RIDGEVIEW RESERVE, Leander: TXR1575XG, held by Liberty Civil Construction, LLC
- 2026-02-10: RYEHILL GROUNDWATER PLANT PHASE I, Sugar Land: TXR1576XG, held by R & B group, Inc.
- 2026-02-10: HORIZON LAKES BATCH PLANT AND PAVING, Mclendon Chisholm: TXR1577XG, held by Glenn Thurman, Inc.
- 2026-02-10: HAVEN RANCH P1 BATCH PLANT AND PAVING, Waxahachie: TXR1578XG, held by Glenn Thurman, Inc.
- 2026-02-10: ESCONDIDO CROSSING, Lubbock: TXR1579XG, held by Addison Homes, LLC
- 2026-02-10: CLEAR CREEK ESTATES SECTION III, Copperas Cove: TXR1581XG, held by Bellpas, Inc.
- 2026-02-10: OXFORD AT THE BOULEVARD, Corinth: TXR1582XG, held by DOW-CON, INC.
- 2026-02-10: PARKSIDE PENINSULA - HB, Georgetwn: TXR1583XG, held by Perry Homes, LLC
- 2026-02-10: TRAILS OF JORDAN CREEK PH 1, Krum: TXR1584XG, held by Chris Harp Construction Limited Liability Company
- 2026-02-10: URBAN HEIGHTS AT PGA BLOCK A LOT 1 & 7, Frisco: TXR1592XG, held by Urban Heights Constructions, LLC
DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION among its neighbors
101 discharge permits are in the Big Bear Creek subwatershed (HUC 120301020703); TXR1580XG is one. Its county: 1,661, 7 major; TXR1580XG is minor permit.
Other permits in the Big Bear Creek subwatershed (HUC 120301020703)
- 210 HARDY DRIVE, Colleyville: TXR1522YS, minor, term to 2028-03-04
- 2910 PARR LANE PHASE 1, Grapevine: TXR1559QC, minor, term to 2028-03-04
- 3036 PARR LANE AND 3107 WINTERGREEN TERRACE, Grapevine: TXR1549XK, minor, term to 2028-03-04
- 7-ELEVEN NEC I-35 AND TIMBERLAND BLVD, Fort Worth: TXR1552MH, minor, term to 2028-03-04
- 7224 OAK ALLEY DRIVE, Colleyville: TXR1537MM, minor, term to 2028-03-04
- AIR GENERAL INC- DFW, Dfw: TXRNECI09, minor, term to 2026-08-13
- ALTA VISTA MHP WWTP, Keller: TX0023591, minor, term to 2011-09-01
- AMERIFLIGHT, Dallas: TXR05EY39, minor, term to 2026-08-13
- BP AEROSPACE, Euless: TXRNECH64, minor, term to 2026-08-13
- BRUMLOW EAST, Southlake: TXR1584YV, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 23 days, February 10, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION |
|---|---|
| Permittee | Dallas-Ft. Worth International Airport Board |
| NPDES ID | TXR1580XG |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 10, 2026 |
| Expires | March 4, 2028 |
| Address | Dallas, TX 75261 |
| Receiving water | GRAPEVINE CREEK |
| Subwatershed | Big Bear Creek (HUC 120301020703) |
NPDES TXR1580XG: effluent limits and exceedances
DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION (NPDES TXR1580XG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1580XG: no pollutant row on file.
NPDES TXR1580XG: inspections, violations and enforcement
NPDES TXR1580XG (DFW AIRPORT WEST AIRFIELD DUCT BANK OPTIMIZATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1580XG
NPDES TXR1580XG: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1580XG
NPDES TXR1580XG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.