NPDES TXR1580XK · Clean Water Act
SAND HILL FARM MITIGATION BANK, Waller, TX: NPDES TXR1580XK discharge permit, effluent exceedances, inspections, penalties
SAND HILL FARM MITIGATION BANK, Waller, Texas: General permit coverage TXR1580XK, held by Wildwood Environmental Credit Company, LLC; Construction stormwater; Effective; issued February 24, 2026, term to March 4, 2028; discharges to LIVE OAK CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,134 were issued before TXR1580XK.
Coverages issued nearest TXR1580XK
- 2026-02-24: WATER LOSS REDUCTION PROJECT DWSRF NO 62805, Buda: TXR1575XK, held by Whitewater Construction, Inc.
- 2026-02-24: MAVERICK MEADOWS UNIT 1, Seguin: TXR1576XK, held by 2020 Fl Cordova, LLC
- 2026-02-24: HCFCD PROJECT ID T100-00-00-X002, Katy: TXR1577XK, held by Harris County Flood Control District
- 2026-02-24: WBT8 - PROJECT UNITED, Beaumont: TXR1578XK, held by E. E. Reed Construction, L.P.
- 2026-02-24: LUCERO 345KV SWITCHYARD, Taft: TXR1579XK, held by Dashiell Corporation
- 2026-02-24: WYNSERRA, Iowa Colony: TXR1581XK, held by 521 Um Holding 770 Acres, LP
- 2026-02-24: AUMOVIO, New Braunfels: TXR1582XK, held by Alston Construction Company, Inc.
- 2026-02-24: WESTRIDGE SINGLE FAMILY, New Braunfels: TXR1583XK, held by PIERCE SITEWORK, LLC
- 2026-02-24: WYNSERRA PH 1 DETENTION FACILITIES & MASS GRADING, Iowa Colony: TXR1584XK, held by Anchor Excavators Inc
- 2026-02-24: QUITMAN ISD 2025 BOND PROGRAM, Quitman: TXR1585XK, held by Tim Jackson Construction Co., Inc.
SAND HILL FARM MITIGATION BANK among its neighbors
17 discharge permits are in the Live Oak Creek subwatershed (HUC 120401020102); TXR1580XK is one. Its county: 314, 3 major; TXR1580XK is minor permit.
Other permits in the Live Oak Creek subwatershed (HUC 120401020102)
- BELLAMINA, Waller: TXR1518UG, minor, term to 2028-03-04
- BELLAMINA, Waller: TXR1549XS, minor, term to 2028-03-04
- BELLAMINA, Waller: TXR1553WB, minor, term to 2028-03-04
- BELLAMINA PHASE 1 DETENTION, Waller: TXR1543UG, minor, term to 2028-03-04
- CASTLEROCK COMMUNITIES- BELLAMINA, Waller: TXR1599ZA, minor, term to 2028-03-04
- INEOS CALABRIAN, Port Neches: TXR05GB41, minor, term to 2026-08-13
- JULISSA MEADOWS WWTP, City Of Waller: TX0147061
- LAKEVIEW, Waller: TXR1541NG, minor, term to 2028-03-04
- LAKEVIEW SEC 7, Waller: TXR1591YX, minor, term to 2028-03-04
- LAKEVIEW SECTION, Waller: TXR1536TP, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 9 days, February 24, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SAND HILL FARM MITIGATION BANK |
|---|---|
| Permittee | Wildwood Environmental Credit Company, LLC |
| NPDES ID | TXR1580XK |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 24, 2026 |
| Expires | March 4, 2028 |
| Address | Waller, TX 77484 |
| Receiving water | LIVE OAK CREEK |
| Subwatershed | Live Oak Creek (HUC 120401020102) |
NPDES TXR1580XK: effluent limits and exceedances
SAND HILL FARM MITIGATION BANK (NPDES TXR1580XK): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1580XK: no pollutant row on file.
NPDES TXR1580XK: inspections, violations and enforcement
NPDES TXR1580XK (SAND HILL FARM MITIGATION BANK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1580XK
NPDES TXR1580XK: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1580XK
NPDES TXR1580XK: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.