NPDES TXR1595YP · Clean Water Act
UPS HUB DFW AIRPORT, Dfw Airport, TX: NPDES TXR1595YP discharge permit, effluent exceedances, inspections, penalties
UPS HUB DFW AIRPORT, Dfw Airport, Texas: General permit coverage TXR1595YP, held by Asps Holdings, LLC; Construction stormwater; Effective; issued June 22, 2026, term to March 4, 2028; discharges to BIG BEAR CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 22,002 were issued before TXR1595YP. Asps Holdings, LLC holds 13 permits in Texas.
Other permits held by Asps Holdings, LLC
- LINE W19 REPLACEMENT, Alvord: TXR1502XQ, issued 2026-03-13
- DFW NORTH ECUP AND SOUTH TEMP BOILER AND DRS INSTALLS, Dfw Airport: TXR1505TF, issued 2025-01-08
- LINE R10 PHASE 2B, San Angelo: TXR1508XQ, issued 2026-03-13
- US HWY 75 AT SH 91, Sherman: TXR1510TF, issued 2025-01-08
- DFW AIRPORT TERMINAL F MAIN INSTALLATION, Dfw Airport: TXR1522ZD, issued 2026-08-13
- N BONNIE BRAE ST & N ELM ST RELOCATION PROJECT, Denton: TXR1544ZB, issued 2026-08-06
- LINE W-7 EAGLE PKWY RELOCATION, Fort Worth: TXR1548XX, issued 2026-04-13
- HEB ONSITE MAIN EXTENSION, Irving: TXR1549UL, issued 2025-04-30
- LINE KC WEST STEEL REPLACEMENT, Abiline: TXR1566QK, issued 2024-04-02
- WRIGHT FARMS OFFSITE, Joshua: TXR1570TG, issued 2025-01-13
Coverages issued nearest TXR1595YP
- 2026-06-22: BULK TERMINAL IMPROVEMENTS AND EXPANSION, Corpus Christi: TXR1538YQ, held by Anderson Columbia Co., Inc.
- 2026-06-22: 6 CREEKS PHASE 1 SECTION 14A1 AND 14A2, Kyle: TXR1539YQ, held by DNT Construction, LLC
- 2026-06-22: HAGGARD FARM ALMANAC ADDITION, Plano: TXR1540YQ, held by Stillwater Gc, LLC
- 2026-06-22: CITY OF KYLE - CENTER STREET PROJECT, Kyle: TXR1541YQ, held by Cash Construction Company, Inc.
- 2026-06-22: CYPRESS CREEK RETAIL, Cedar Park: TXR1594YP, held by Hallmark Engineering & Infrastructure Company LLC
- 2026-06-22: CALVILLO CUSTOM HOMES, Fort Worth: TXR1596YP, held by Calvillo Ayala Jose Noe
- 2026-06-22: 6816 LOVE CT WATERSTONE ESTATES - HOME BUILDING, Mckinney: TXR1597YP, held by Partners In Building, L.P.
- 2026-06-22: FY 26 CHANNEL TO HARLINGEN PLACEMENT AREAS 18 AND 22 IMP, Edinburg: TXR1598YP, held by Clore Equipment LLC
- 2026-06-22: 2228 DEER RIDGE THE HILLS OF LONESTAR - HOME BUILDING, Celina: TXR1599YP, held by Partners In Building, L.P.
- 2026-06-23: HARMON ROAD APARTMENTS, Fort Worth: TXR1542YQ, held by TX-Morrow Construction, Inc.
UPS HUB DFW AIRPORT among its neighbors
101 discharge permits are in the Big Bear Creek subwatershed (HUC 120301020703); TXR1595YP is one. Its county: 1,661, 7 major; TXR1595YP is minor permit.
Other permits in the Big Bear Creek subwatershed (HUC 120301020703)
- 210 HARDY DRIVE, Colleyville: TXR1522YS, minor, term to 2028-03-04
- 2910 PARR LANE PHASE 1, Grapevine: TXR1559QC, minor, term to 2028-03-04
- 3036 PARR LANE AND 3107 WINTERGREEN TERRACE, Grapevine: TXR1549XK, minor, term to 2028-03-04
- 7-ELEVEN NEC I-35 AND TIMBERLAND BLVD, Fort Worth: TXR1552MH, minor, term to 2028-03-04
- 7224 OAK ALLEY DRIVE, Colleyville: TXR1537MM, minor, term to 2028-03-04
- AIR GENERAL INC- DFW, Dfw: TXRNECI09, minor, term to 2026-08-13
- ALTA VISTA MHP WWTP, Keller: TX0023591, minor, term to 2011-09-01
- AMERIFLIGHT, Dallas: TXR05EY39, minor, term to 2026-08-13
- BP AEROSPACE, Euless: TXRNECH64, minor, term to 2026-08-13
- BRUMLOW EAST, Southlake: TXR1584YV, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 256 days, June 22, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | UPS HUB DFW AIRPORT |
|---|---|
| Permittee | Asps Holdings, LLC |
| NPDES ID | TXR1595YP |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 22, 2026 |
| Expires | March 4, 2028 |
| Address | Dfw Airport, TX 75061 |
| Receiving water | BIG BEAR CREEK |
| Subwatershed | Big Bear Creek (HUC 120301020703) |
NPDES TXR1595YP: effluent limits and exceedances
UPS HUB DFW AIRPORT (NPDES TXR1595YP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1595YP: no pollutant row on file.
NPDES TXR1595YP: inspections, violations and enforcement
NPDES TXR1595YP (UPS HUB DFW AIRPORT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1595YP
NPDES TXR1595YP: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1595YP
NPDES TXR1595YP: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.