NPDES TXR1599WR · Clean Water Act
CEDAR HILL TO SWIFTEX TL OVERHAUL, Elgin, TX: NPDES TXR1599WR discharge permit, effluent exceedances, inspections, penalties
CEDAR HILL TO SWIFTEX TL OVERHAUL, Elgin, Texas: General permit coverage TXR1599WR, held by Saber Power Services, LLC; Construction stormwater; Effective; issued December 10, 2025, term to March 4, 2028; discharges to BIG SANDY CREEK TO COLORADO RIVER ABOVE LA GRANGE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,516 were issued before TXR1599WR. Saber Power Services, LLC holds 27 permits in Texas.
Other permits held by Saber Power Services, LLC
- EAST WEST 120MW BESS & 13834.5KV SUBSTATION, Mountain Home: TXR1501VY, issued 2025-09-23
- OVERLAND SUBSTATION S812 ADDITION, Fort Stockton: TXR1503XK, issued 2026-02-19
- SAN MARCOS SUBSTATION, San Marcos: TXR1508SL, issued 2024-10-15
- BAKERFIELD SYNCHRONOUS CONDENSER, Fort Stockton: TXR1514WJ, issued 2025-11-05
- PASTOR SUBSTATION S805 ADDITON, Paint Rock: TXR1519XD, issued 2026-01-28
- JOHN DUMAS SUBSTATION ADDITION, Maxwell: TXR1520NY, issued 2023-08-10
- ROCK ROSE BESS, Needville: TXR1521WT, issued 2025-12-15
- COUNTY LINE SUBSTATION, Cedar Creek: TXR1523YE, issued 2026-05-07
- HIGHLINE SUBSTATION, Cedar Creek: TXR1530XS, issued 2026-03-23
- MULSHOE 345 KV SUBSTATION, Gail: TXR1531YP, issued 2026-06-18
Coverages issued nearest TXR1599WR
- 2025-12-10: TXDOT BWD CSJ 0289-04-034, San Saba: TXR1593WR, held by Texas Department of Transportation
- 2025-12-10: MESA VISTA SEC 1, Houston: TXR1594WR, held by Blazey Construction Services, LLC
- 2025-12-10: LEXINGTON CDBG-MIT DRAINAGE IMPROVEMENTS, Lexington: TXR1596WR, held by C.C. Carlton Industries, LTD.
- 2025-12-10: PEARLBROOK SUBDIVISION SEC 10, Texas City: TXR1597WR, held by Blazey Construction Services, LLC
- 2025-12-10: IH-10 FORCE MAIN RE-ALIGNMENT, Seguin: TXR1598WR, held by Guerra Underground LLC
- 2025-12-11: JPS HOSPITAL ADDITIONS, Fort Worth: TXR1510WS, held by Austin Commercial, LP
- 2025-12-11: TEXAS A&M PLAYER DEVELOPMENT CENTER AT BLUE BELL PARK, College Station: TXR1511WS, held by Austin Commercial, LP
- 2025-12-11: HIGH MEADOW WEST - 25017 CHISOS BEND - HOME BUILDING, Montgomery: TXR1512WS, held by Matt Powers Custom Homes LLC
- 2025-12-11: DOGWOOD AVENUE, Manvel: TXR1513WS, held by Northtex Construction, LLC
- 2025-12-11: KENDALL LAKES SEC 12, Alvin: TXR1514WS, held by Blazey Construction Services, LLC
CEDAR HILL TO SWIFTEX TL OVERHAUL among its neighbors
22 discharge permits are in the Little Sandy Creek subwatershed (HUC 120903010203); TXR1599WR is one. Its county: 222, 5 major; TXR1599WR is minor permit.
Other permits in the Little Sandy Creek subwatershed (HUC 120903010203)
- CEDAR HILL TO SWIFTEX T367 TRANSMISSION LINE OVERHAUL, Elgin: TXR1556WP, minor, term to 2028-03-04
- CEDAR HILL TO SWIFTEX T367 TRANSMISSION LINE OVERHAUL, Elgin: TXR1590WS, minor, term to 2028-03-04
- CENTRAL WWTP, Pflugerville: TX0094927, major, term to 2019-09-01
- ELGIN MIDDLE SCHOOL 2, Elgin: TXR1571VM, minor, term to 2028-03-04
- ELGIN WWTP, Elgin: TX0073946, major, term to 2024-10-29
- HIDDEN OAKS SECTION 3, Elgin: TXR1568UU, minor, term to 2028-03-04
- PRADO VISTA SUBDIVISION, Elgin: TXR1553YX, minor, term to 2028-03-04
- SACRED HEART ELGIN, Elgin: TXR1565RW, minor, term to 2028-03-04
- SOUTH ELGIN TRANSMISSION MAIN REPAIR, Elgin: TXR1573PM, minor, term to 2028-03-04
- THE KATY AT ELGIN, Elgin: TXR1575SE, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 85 days, December 10, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CEDAR HILL TO SWIFTEX TL OVERHAUL |
|---|---|
| Permittee | Saber Power Services, LLC |
| NPDES ID | TXR1599WR |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 10, 2025 |
| Expires | March 4, 2028 |
| Address | Elgin, TX 78602 |
| Receiving water | BIG SANDY CREEK TO COLORADO RIVER ABOVE LA GRANGE |
| Subwatershed | Little Sandy Creek (HUC 120903010203) |
NPDES TXR1599WR: effluent limits and exceedances
CEDAR HILL TO SWIFTEX TL OVERHAUL (NPDES TXR1599WR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1599WR: no pollutant row on file.
NPDES TXR1599WR: inspections, violations and enforcement
NPDES TXR1599WR (CEDAR HILL TO SWIFTEX TL OVERHAUL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1599WR
NPDES TXR1599WR: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1599WR
NPDES TXR1599WR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.