NPDES UTG070393 · Clean Water Act
LAKE SIDE 2 POWER PROJECT, Vineyard, UT: NPDES UTG070393 discharge permit, effluent exceedances, inspections, penalties
LAKE SIDE 2 POWER PROJECT, Vineyard, Utah: General permit coverage UTG070393, held by CH2M Hill Engineers, Inc.; Administratively continued; issued May 1, 2011, term to May 30, 2012, by Utah Division of Water Quality; discharges to Lindon Hollow Creek thence Utah Lake.
No violation or effluent exceedance is on file for any of the 5 pollutants listed for NPDES UTG070393.
- Solids, total suspended: 3 limits.
- Flow rate: 2 limits.
- pH: 2 limits.
- Oil and grease: 1 limit.
- Oil and grease visual: 1 limit.
LAKE SIDE 2 POWER PROJECT among its neighbors
332 discharge permits are in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803); UTG070393 is one. Its county: 249, 4 major; UTG070393 is minor permit.
Other permits in the Lower American Fork Canyon-Frontal Utah Lake subwatershed (HUC 160202010803)
- &00 N. WAREHOUSE, Lindon: UTR394939, minor, term to 2021-07-19
- 1273 N 380 E, Pleasant Grove: UTRH09742, minor, term to 2026-05-18
- 1299N. 380E. PLEASANT GROVE, Pleasant Grove: UTRH08257, minor, term to 2025-07-01
- 132 S, Pleasant Grove: UTRL00736
- 175 N 800 W LINDON, Lindon: UTRH04238, minor, term to 2022-11-16
- 1758 N 320 E PLEASANT GROVE, Pleasant Grove: UTRH00762, minor, term to 2021-07-07
- 190 E, Pleasant Grove: UTRL00735
- 304 N. 100 E. PLEASANT GROVE, UT. 84062, Pleasant Grove: UTRH01374, minor, term to 2021-09-24
- 36 CULINARY WATER LINE REPLACEMENT PROJECT, American Fork: UTRH01789, minor, term to 2021-11-24
- 43 NORTH APARTMENTS, American Fork: UTRC06632, minor, term to 2025-03-29
What stands out
- Its term runs 1 year and 29 days, May 1, 2011 to May 30, 2012; the term ended 5,221 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; the file names no program for it, and it is a minor discharger.
Identity
| Facility | LAKE SIDE 2 POWER PROJECT |
|---|---|
| Permittee | CH2M Hill Engineers, Inc. |
| NPDES ID | UTG070393 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | May 1, 2011 |
| Expires | May 30, 2012 |
| Agency | Utah Division of Water Quality |
| Address | Vineyard, UT 84058 |
| Receiving water | Lindon Hollow Creek thence Utah Lake |
| Subwatershed | Lower American Fork Canyon-Frontal Utah Lake (HUC 160202010803) |
NPDES UTG070393: effluent limits and exceedances
LAKE SIDE 2 POWER PROJECT (NPDES UTG070393): 5 pollutants on file, 5 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 3 | 0 | 0 | ||
| Flow rate | 2 | 0 | 0 | ||
| pH | 2 | 0 | 0 | ||
| Oil and grease | 1 | 0 | 0 | ||
| Oil and grease visual | 1 | 0 | 0 |
NPDES UTG070393: inspections, violations and enforcement
NPDES UTG070393 (LAKE SIDE 2 POWER PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTG070393
NPDES UTG070393: one email when its EPA record changes — $99/month.
Permits near NPDES UTG070393
NPDES UTG070393: 5 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.