Velarion Records
Free: one email when NPDES UTG070755 changes. Unsubscribe any time.

NPDES UTG070755 · Clean Water Act

FEEDER LINE 99 PIPELINE REPLACEMENT PROCESS, Wasatch County, UT: NPDES UTG070755 discharge permit, effluent exceedances, inspections, penalties

FEEDER LINE 99 PIPELINE REPLACEMENT PROCESS, Wasatch County, Utah: General permit coverage UTG070755, held by Whitaker Construction Company; Administratively continued; issued April 1, 2015, term to December 31, 2015, by Utah Division of Water Quality; discharges to Provo River; Oil and Gas Pipeline and Related Structures Construction.

No violation or effluent exceedance is on file for any of the 5 pollutants listed for NPDES UTG070755.

  • Solids, total suspended: 3 limits.
  • Flow rate: 2 limits.
  • pH: 2 limits.
  • Oil and grease: 1 limit.
  • Oil and grease visual: 1 limit.

Other permits held by Whitaker Construction Company

FEEDER LINE 99 PIPELINE REPLACEMENT PROCESS among its neighbors

53 discharge permits are in the Cottonwood Canyon-Provo River subwatershed (HUC 160202030304); UTG070755 is one. Its county: 34, 1 major; UTG070755 is minor permit.

Other permits in the Cottonwood Canyon-Provo River subwatershed (HUC 160202030304)

Identity

FacilityFEEDER LINE 99 PIPELINE REPLACEMENT PROCESS
PermitteeWhitaker Construction Company
NPDES IDUTG070755
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
IssuedApril 1, 2015
ExpiresDecember 31, 2015
AgencyUtah Division of Water Quality
AddressWasatch County, UT 84302
Receiving waterProvo River
SubwatershedCottonwood Canyon-Provo River (HUC 160202030304)
NAICS237120 – Oil and Gas Pipeline and Related Structures Construction
SIC1623 – Water, Sewer, And Utility Lines

NPDES UTG070755: effluent limits and exceedances

FEEDER LINE 99 PIPELINE REPLACEMENT PROCESS (NPDES UTG070755): 5 pollutants on file, 5 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended300
Flow rate200
pH200
Oil and grease100
Oil and grease visual100

NPDES UTG070755: inspections, violations and enforcement

NPDES UTG070755 (FEEDER LINE 99 PIPELINE REPLACEMENT PROCESS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTG070755

NPDES UTG070755: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTG070755

NPDES UTG070755: 5 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.