Velarion Records
Free: one email when NPDES UTG072141 changes. Unsubscribe any time.

NPDES UTG072141 · Clean Water Act

BRIDGE REPLACEMENT AT ROCKPORT RESERVOIR, Peoa, UT: NPDES UTG072141 discharge permit, effluent exceedances, inspections, penalties

BRIDGE REPLACEMENT AT ROCKPORT RESERVOIR, Peoa, Utah: General permit coverage UTG072141, held by MC Contractors, Inc.; Effective; issued May 27, 2026, term to May 27, 2027, by Utah Division of Water Quality.

No violation or effluent exceedance is on file for any of the 5 pollutants listed for NPDES UTG072141.

  • Solids, total suspended: 3 limits.
  • Flow rate: 2 limits.
  • pH: 2 limits.
  • Oil and grease: 1 limit.
  • Oil and grease visual: 1 limit.
  • June 12, 2026: Evaluation (S).

Other permits held by MC Contractors, Inc.

BRIDGE REPLACEMENT AT ROCKPORT RESERVOIR among its neighbors

31 discharge permits are in the Browns Canyon-Weber River subwatershed (HUC 160201010401); UTG072141 is one.

Other permits in the Browns Canyon-Weber River subwatershed (HUC 160201010401)

What stands out

  • Its term runs 1 year, May 27, 2026 to May 27, 2027.
  • Its newest dated event on file is an inspection on June 12, 2026, 95 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 1 event for it, all in 2026.
  • It is one of 17,184 discharge permits on the register in Utah; the file names no program for it, and it is a minor discharger.

Identity

FacilityBRIDGE REPLACEMENT AT ROCKPORT RESERVOIR
PermitteeMC Contractors, Inc.
NPDES IDUTG072141
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
IssuedMay 27, 2026
ExpiresMay 27, 2027
AgencyUtah Division of Water Quality
AddressPeoa, UT 84061
Receiving water impaired303(D) Listed
SubwatershedBrowns Canyon-Weber River (HUC 160201010401)

NPDES UTG072141: effluent limits and exceedances

BRIDGE REPLACEMENT AT ROCKPORT RESERVOIR (NPDES UTG072141): 5 pollutants on file, 5 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended300
Flow rate200
pH200
Oil and grease100
Oil and grease visual100

NPDES UTG072141: inspections, violations and enforcement

NPDES UTG072141: 1 inspection

DateWhat EPA recordedAgency
June 12, 2026EvaluationS

NPDES UTG072141 (BRIDGE REPLACEMENT AT ROCKPORT RESERVOIR): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES UTG072141

NPDES UTG072141: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTG072141

NPDES UTG072141: 5 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.