NPDES UTNX00583 · Clean Water Act
ALBANY ENGINEERED COMPOSITES, Salt Lake City, UT: NPDES UTNX00583 discharge permit, effluent exceedances, inspections, penalties
ALBANY ENGINEERED COMPOSITES, Salt Lake City, Utah: General permit coverage UTNX00583, held by Albany; Industrial stormwater; Effective; issued March 7, 2022, term to March 7, 2027, by UTDEQ.
Utah holds 1,101 Industrial stormwater coverages of this permit type in EPA’s file; 877 were issued before UTNX00583.
Coverages issued nearest UTNX00583
- 2022-01-25: 515 COLOROW DR, Salt Lake City: UTNX00578, held by BioFire Diagnostics
- 2022-01-27: SOLDIER CANYON MINE, Wellington: UTNX00579, held by Canyon Fuel Company, LLC
- 2022-02-10: BRINGARD MILLWORKS, West Valley City: UTNX00580, held by Bringard Millworks LC
- 2022-03-05: WALMART DC #7026, Grantsville: UTNX00581, held by Walmart DC #7026
- 2022-03-07: ALBANY ENGINEERED COMPOSITES, Salt Lake City: UTNX00582, held by Albany Engineered Composites
- 2022-03-29: JORDAN BASIN WATER RECLAMATION FACILITY, Riverton: UTND00055, held by Joel Thompson
- 2022-04-05: RB HEALTH MANUFACTURING LLC, Salt Lake City: UTNX00584, held by RB Health Manufacturing LLC
- 2022-04-26: OREM WATER RECLAMATION FACILITY, Orem: UTND00053, held by Orem Water Reclamation Facility
- 2022-04-28: DUNFORD BAKERS, West Jordan: UTNX00586, held by United States Bakery
- 2022-05-12: MODERE - SALEM, Salem: UTNX00587, held by Maple Mountain Group, Inc. d.b.a. Modere, Inc.
ALBANY ENGINEERED COMPOSITES among its neighbors
186 discharge permits are in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404); UTNX00583 is one.
Other permits in the Crystal Creek-Frontal Great Salt Lake subwatershed (HUC 160202040404)
- 3253 N COMMON, Salt Lake City: UTRH07704, minor, term to 2025-03-11
- 3891 W IRON ROSE PL, Salt Lake City: UTRL00701
- 3FORM, Salt Lake City: UTNX00207, minor, term to 2024-09-05
- 5300 WEST LIFT STATION (SS17) CAPACITY UPGRADES, Salt Lake City: UTG071916, minor, term to 2025-11-05
- 6880 ROAD EXTENSION PROJECT (QUADRANT 2 INFRASTRUCTURE), Salt Lake City: UTRC05573, minor, term to 2023-08-03
- 700 S RECONSTRUCTION PHASE 7, Salt Lake City: UTRC12324, minor, term to 2027-02-22
- 80TH WEST INDUSTRIAL BUILDING 3, Salt Lake City: UTRC05085, minor, term to 2023-06-07
- 80TH WEST INDUSTRIAL BUILDINGS 1 & 2, Salt Lake City: UTRC05084, minor, term to 2023-06-07
- 855 GLADIOLA OFFICE & WAREHOUSE, Salt Lake City: UTRC04596, minor, term to 2023-03-13
- AC MITIGATION INSTALL MP 130-131, Salt Lake City: UTRC13356, minor, term to 2027-08-09
What stands out
- Its term runs 5 years, March 7, 2022 to March 7, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 1,120 of them (6.5%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | ALBANY ENGINEERED COMPOSITES |
|---|---|
| Permittee | Albany |
| NPDES ID | UTNX00583 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | March 7, 2022 |
| Expires | March 7, 2027 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84116 |
| Subwatershed | Crystal Creek-Frontal Great Salt Lake (HUC 160202040404) |
NPDES UTNX00583: effluent limits and exceedances
ALBANY ENGINEERED COMPOSITES (NPDES UTNX00583): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTNX00583: no pollutant row on file.
NPDES UTNX00583: inspections, violations and enforcement
NPDES UTNX00583 (ALBANY ENGINEERED COMPOSITES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTNX00583
NPDES UTNX00583: one email when its EPA record changes — $99/month.
Permits near NPDES UTNX00583
NPDES UTNX00583: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.