NPDES UTR339761 · Clean Water Act
PRC I-15 CORE PROJECT SPRINGVILLE SITES, Lehi, UT: NPDES UTR339761 discharge permit, effluent exceedances, inspections, penalties
PRC I-15 CORE PROJECT SPRINGVILLE SITES, Lehi, Utah: General permit coverage UTR339761, held by Provo River Constructors; Construction stormwater; Administratively continued; issued March 1, 2010, term to December 31, 2012, by Utah Division of Water Quality; discharges to None.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 19 were issued before UTR339761. Provo River Constructors holds 2 permits in Utah.
Other permits held by Provo River Constructors
- I15 CORE PROJECT, UDOT NO. MP-I15-6 (178) 245 - MULTI DEWATERING SITES, Lehi: UTG070335, issued 2010-04-20
Coverages issued nearest UTR339761
- 2009-10-05: 300 WEST TOWNE CENTER, Salt Lake City: UTR328311, held by Harper Contracting
- 2009-10-14: VERNAL MUNICIPAL CENTER, Vernal: UTR328760, held by Big D Construction
- 2010-01-11: SWGWTP BY-PRODUCT PIPELINE PHASE 1, West Jordan: UTR333060, held by COP Construction
- 2010-01-12: NORTHROP GRUMMAN BUILDING ADDITION, Salt Lake City: UTR333810, held by SIRQ, Inc
- 2010-02-09: WEST VIEW SUBDIVISION, Springville: UTR335862, held by JACK PERRY
- 2010-04-07: JUNCTION TO MARYSVILLE, Piute County: UTR340014, held by Hales Sand & Gravel
- 2010-04-12: SPANISH FIELDS WEST, Spanish Fork: UTR340032, held by Fieldstone Homes Utah, LLC
- 2010-04-30: RUBY PIPELINE, Cache County: UTR340084, held by Ruby Pipeline LLC
- 2010-05-01: UNIFIED FIRE AUTHORITY STATION #111, Magna: UTR340019, held by Magna Fire Station #111
- 2010-05-11: I-15, ANDERSON JUNCTION TO BLACK RIDGE, Pintura: UTR340123, held by W W Clyde & Company
PRC I-15 CORE PROJECT SPRINGVILLE SITES among its neighbors
208 discharge permits are in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804); UTR339761 is one. Its county: 249, 4 major; UTR339761 is minor permit.
Other permits in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804)
- 162 W 800 S, Orem: UTRH03871, minor, term to 2022-09-15
- 2023 OREM CITY CONCRETE PROJECT - VARIOUS LOCATIONS, Orem: UTRL00498
- ABBEY ROAD, Orem: UTRC03795, minor, term to 2024-11-02
- ABBEY ROAD LOT 13, Orem: UTRH11220, minor, term to 2027-04-05
- ACADIA HEIGHTS, Orem: UTRC10764, minor, term to 2026-04-24
- ADHESIVES TECHNOLOGY CORPORATION, Orem: UTNX00700, minor, term to 2030-09-25
- ALLIE & STACY RESIDENCE, Vineyard: UTRH05813, minor, term to 2023-09-08
- ALMA MILES RESIDENCE, Orem: UTRH05948, minor, term to 2023-10-11
- ALTUS GENEVA RETAIL LOT 203 - VINEYARD, Vineyard: UTRC09202, minor, term to 2025-07-11
- ARCHIBALD RESIDENCE OREM, Orem: UTRH11543, minor, term to 2027-06-07
Identity
| Facility | PRC I-15 CORE PROJECT SPRINGVILLE SITES |
|---|---|
| Permittee | Provo River Constructors |
| NPDES ID | UTR339761 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 1, 2010 |
| Expires | December 31, 2012 |
| Agency | Utah Division of Water Quality |
| Address | Lehi, UT 84043 |
| Receiving water | None |
| Subwatershed | Dry Canyon-Frontal Utah Lake (HUC 160202010804) |
NPDES UTR339761: effluent limits and exceedances
PRC I-15 CORE PROJECT SPRINGVILLE SITES (NPDES UTR339761): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTR339761: no pollutant row on file.
NPDES UTR339761: inspections, violations and enforcement
NPDES UTR339761 (PRC I-15 CORE PROJECT SPRINGVILLE SITES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTR339761
NPDES UTR339761: one email when its EPA record changes — $99/month.
Permits near NPDES UTR339761
NPDES UTR339761: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.