Velarion Records
Free: one email when NPDES UTR383817 changes. Unsubscribe any time.

NPDES UTR383817 · Clean Water Act

CARRIAGE CROSSING PHASE 4, Tooele, UT: NPDES UTR383817 discharge permit, effluent exceedances, inspections, penalties

CARRIAGE CROSSING PHASE 4, Tooele, Utah: General permit coverage UTR383817, held by GTM Builders`; Construction stormwater; Administratively continued; issued December 6, 2017, term to December 6, 2018, by Utah Division of Water Quality; discharges to Great Salt Lake.

  • March 4, 2019: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • March 4, 2019: WW Storm Water Construction - Failure to Maintain Records (ST6).
  • March 4, 2019: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • March 4, 2019: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 152 were issued before UTR383817.

Coverages issued nearest UTR383817

CARRIAGE CROSSING PHASE 4 among its neighbors

51 discharge permits are in the South Willow Creek-Frontal Great Salt Lake subwatershed (HUC 160203040503); UTR383817 is one. Its county: 70, 1 major; UTR383817 is minor permit.

Other permits in the South Willow Creek-Frontal Great Salt Lake subwatershed (HUC 160203040503)

What stands out

  • Its term runs 1 year, December 6, 2017 to December 6, 2018; the term ended 2,840 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on March 4, 2019, 2,752 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 4 events for it, all in 2019.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCARRIAGE CROSSING PHASE 4
PermitteeGTM Builders`
NPDES IDUTR383817
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedDecember 6, 2017
ExpiresDecember 6, 2018
AgencyUtah Division of Water Quality
AddressTooele, UT 84029
Receiving waterGreat Salt Lake
SubwatershedSouth Willow Creek-Frontal Great Salt Lake (HUC 160203040503)

NPDES UTR383817: effluent limits and exceedances

CARRIAGE CROSSING PHASE 4 (NPDES UTR383817): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTR383817: no pollutant row on file.

NPDES UTR383817: inspections, violations and enforcement

NPDES UTR383817: 4 single-event violations

DateWhat EPA recordedAgency
March 4, 2019WW Storm Water Construction - Failure to Conduct InspectionsST6
March 4, 2019WW Storm Water Construction - Failure to Maintain RecordsST6
March 4, 2019WW Storm Water Construction - Failure to properly install/implement BMPsST6
March 4, 2019WW Storm Water Construction - Failure to properly operate and maintain BMPsST6

NPDES UTR383817 (CARRIAGE CROSSING PHASE 4): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTR383817

NPDES UTR383817: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTR383817

NPDES UTR383817: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded September 15, 2026.