NPDES UTR392249 · Clean Water Act
PROVIDENCE AT OVERLAKE, Tooele, UT: NPDES UTR392249 discharge permit, effluent exceedances, inspections, penalties
PROVIDENCE AT OVERLAKE, Tooele, Utah: General permit coverage UTR392249, held by Providence Tooele LLC; Construction stormwater; Administratively continued; issued May 21, 2020, term to March 28, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 496 were issued before UTR392249.
Coverages issued nearest UTR392249
- 2020-05-20: LOT 19 EDEN ACRES, Eden: UTRH00491, held by CK Construction & Roofing, Inc.
- 2020-05-20: LOT 67 - TONAQUINT TERRACE PHASE 4, St. George: UTRH00492, held by Fairbanks Signature Homes
- 2020-05-20: RIVER CROSSINGS, Plain City: UTRH00493, held by Casey Meenderink
- 2020-05-20: SWENSEN CUSTOM, South Jordan: UTRH00497, held by Hibbs Homes, LLC
- 2020-05-20: VICTORY RANCH, Heber City: UTRH00500, held by Russell and Co
- 2020-05-21: OWEN RESIDENCE, Alpine: UTRC00519, held by Jackson & LeRoy
- 2020-05-21: SUNTANA DUMP SITE, Springville: UTRC00522, held by Sunroc Corporation
- 2020-05-21: TAYLOR RESIDENCE, Highland: UTRC00523, held by Eric Budge Construction
- 2020-05-21: BALL, Warren: UTRC00525, held by farr built homes
- 2020-05-21: SKYLINE RIDGE PHASE 3, Eagle Mountain: UTRC00526, held by Bach Homes
PROVIDENCE AT OVERLAKE among its neighbors
99 discharge permits are in the Middle Canyon subwatershed (HUC 160203040402); UTR392249 is one.
Other permits in the Middle Canyon subwatershed (HUC 160203040402)
- 424 PV, Tooele: UTRH02555, minor, term to 2022-03-14
- 426 PV, Tooele: UTRH02569, minor, term to 2022-03-14
- AFCU TOOELE, Tooele: UTRC12703, minor, term to 2027-04-23
- APTUS, Tooele: UTR000135, minor, term to 1997-09-30
- BEVAN ESTATES, Tooele: UTRC02684, minor, term to 2024-04-29
- CAFE ZUPAS TOOELE SHELL, Tooele: UTRC12298, minor, term to 2027-02-12
- CANYON SPRINGS PHASE 1, Tooele: UTRC12170, minor, term to 2027-01-14
- CARR FORK & IS&R TOOELE SMELTER, Tooele: UTR000030, minor, term to 2002-12-31
- CHASE BANK TOOELE, Tooele: UTRC11775, minor, term to 2026-10-14
- CHILI'S TOOELE #1679, Tooele: UTRC09915, minor, term to 2025-11-19
What stands out
- Its term runs 311 days, May 21, 2020 to March 28, 2021; the term ended 1,997 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROVIDENCE AT OVERLAKE |
|---|---|
| Permittee | Providence Tooele LLC |
| NPDES ID | UTR392249 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 21, 2020 |
| Expires | March 28, 2021 |
| Agency | UTDEQ |
| Address | Tooele, UT 84074 |
| Subwatershed | Middle Canyon (HUC 160203040402) |
NPDES UTR392249: effluent limits and exceedances
PROVIDENCE AT OVERLAKE (NPDES UTR392249): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTR392249: no pollutant row on file.
NPDES UTR392249: inspections, violations and enforcement
NPDES UTR392249 (PROVIDENCE AT OVERLAKE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTR392249
NPDES UTR392249: one email when its EPA record changes — $99/month.
Permits near NPDES UTR392249
NPDES UTR392249: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.