NPDES UTRC00602 · Clean Water Act
WHITE PINE CANYON VILLAGE, Summit, UT: NPDES UTRC00602 discharge permit, effluent exceedances, inspections, penalties
WHITE PINE CANYON VILLAGE, Summit, Utah: General permit coverage UTRC00602, held by Design Build Contractors; Construction stormwater; Effective; issued May 15, 2025, term to June 5, 2026, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,347 were issued before UTRC00602. Design Build Contractors holds 2 permits in Utah.
Other permits held by Design Build Contractors
- CALL RESIDENCE - LOT 1 ALPINE VIEW ESTATES, Alpine: UTRC04713, issued 2022-03-30
Coverages issued nearest UTRC00602
- 2025-05-14: MOAB UMTRA PROJECT AT CRESCENT JUNCTION, Moab: UTR359187, held by US Department of Energy
- 2025-05-14: UTAH ORE SAMPLING, Murray: UTRC06874, held by CCI, Inc
- 2025-05-14: MOUNTAIN POINT PHASE 4, Bluffdale: UTRC10874, held by Hadco Construction
- 2025-05-14: 9000 SOUTH C STORE BY KDK CONSTRUCTION., Sandy: UTRC10875, held by KDK Construction
- 2025-05-14: CB1, Hyde Park: UTRH09720, held by Duke Building Co.
- 2025-05-15: BECCO CREEK, St. George: UTRC06814, held by Henry Walker Homes
- 2025-05-15: PROVIDENCE SPRINGS 55+, Providence: UTRC06872, held by Providence 55, LLC
- 2025-05-15: TBR - HAIRPIN TIPPING SITE, Park City: UTRC06885, held by JMC Excavation
- 2025-05-15: HIATT CREEK, Payson: UTRC10880, held by Red Pine Construction
- 2025-05-15: SHELTER HILL - POWDER MOUNTAIN, Eden: UTRC10881, held by Granite Construction
WHITE PINE CANYON VILLAGE among its neighbors
132 discharge permits are in the Kimball Creek subwatershed (HUC 160201020101); UTRC00602 is one.
Other permits in the Kimball Creek subwatershed (HUC 160201020101)
- 14 IRON CANYON, Park City: UTRH06261, minor, term to 2024-02-07
- 201 WPC, Park City: UTRC01914, minor, term to 2023-01-13
- 2021 SHULER RESIDENCE, Park City: UTRH01889, minor, term to 2021-12-14
- 227 WHITE PINE CANYON ROAD, Park City: UTRH10438, minor, term to 2026-10-01
- 227_WPC_LAYTON_BARN, Park City: UTRH08158, minor, term to 2025-06-05
- 238 WHITE PINE CANYON ROAD, Park City: UTRC08282, minor, term to 2025-02-07
- 258 WHITE PINE CANYON, Park City: UTRH08022, minor, term to 2025-05-07
- 2668 ASPEN SPRINGS DR., Park City: UTRC10566, minor, term to 2026-03-30
- 267 WHITE PINE CANYON ROAD, Park City: UTRC10963, minor, term to 2026-05-26
- 267 WHITE PINE CANYON ROAD, Park City: UTRH03478, minor, term to 2022-07-26
What stands out
- Its term runs 1 year and 21 days, May 15, 2025 to June 5, 2026; the term ended 131 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WHITE PINE CANYON VILLAGE |
|---|---|
| Permittee | Design Build Contractors |
| NPDES ID | UTRC00602 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 15, 2025 |
| Expires | June 5, 2026 |
| Agency | UTDEQ |
| Address | Summit, UT 84098 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Kimball Creek (HUC 160201020101) |
NPDES UTRC00602: effluent limits and exceedances
WHITE PINE CANYON VILLAGE (NPDES UTRC00602): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC00602: no pollutant row on file.
NPDES UTRC00602: inspections, violations and enforcement
NPDES UTRC00602 (WHITE PINE CANYON VILLAGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC00602
NPDES UTRC00602: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC00602
NPDES UTRC00602: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.