NPDES UTRC01515 · Clean Water Act
UINTAH BASIN MEDICAL CENTER - MOB3, Vernal, UT: NPDES UTRC01515 discharge permit, effluent exceedances, inspections, penalties
UINTAH BASIN MEDICAL CENTER - MOB3, Vernal, Utah: General permit coverage UTRC01515, held by Westland Construction; Construction stormwater; Administratively continued; issued October 27, 2020, term to October 26, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,087 were issued before UTRC01515. Westland Construction holds 44 permits in Utah.
Other permits held by Westland Construction
- NOORDA COLLEGE PROJECT SITE, Provo: UTG790082, issued 2020-02-03
- SCIP CLINIC, Salem: UTR369413, issued 2014-11-24
- LEHI HIGH SCHOOL REBUILD, Lehi: UTR385969, issued 2020-03-27
- SUIP - REVERE HEALTH, St. George: UTR392877, issued 2019-04-26
- PRIMROSE OF WASHINGTON, Washington: UTR395735, issued 2019-08-28
- NOORDA COLLEGE OF OSTEOPATHIC MEDICINE, Provo: UTR397105, issued 2021-10-05
- MAPLE GROVE MIDDLE SCHOOL, Mapleton: UTR398405, issued 2020-01-08
- NEW LEHI MIDDLE SCHOOL 435, Lehi: UTR398571, issued 2020-01-15
- NEW VINEYARD ELEMENTARY, Vineyard: UTRC00013, issued 2020-02-26
- OREM TEMPLE, Orem: UTRC00440, issued 2020-05-06
Coverages issued nearest UTRC01515
- 2020-10-26: 92-R HARRISBURG, Clinton: UTRH01576, held by Bretwood Homes, LLC
- 2020-10-26: LOT 8 HENRY FLAT, Ogden: UTRH01577, held by Kirk Christiansen
- 2020-10-27: SPANISH SPRINGS PHASE 1 INFRASTRUCTURE, Spanish Fork: UTRC01508, held by Tom Stuart Construction
- 2020-10-27: HARVEST PARK PHASE 3, South Weber: UTRC01510, held by Nilson Homes
- 2020-10-27: QUAIL COVE, Hooper: UTRC01511, held by Nilson Homes
- 2020-10-27: THE HOMES AT PARKWAY (PHASES 2, 3, & 4), Providence: UTRC01516, held by Danny Macfarlane
- 2020-10-27: SERENITY, Pleasant View: UTRH01590, held by Copperside Construction
- 2020-10-27: SOUTH RIM AT FOREMASTER RIDGE LOT 66, St. George: UTRH01592, held by Madsen Homes
- 2020-10-28: BEST ACRES, Ivins: UTRC01524, held by Ronald Tim Best Gia S Best
- 2020-10-28: MARY'S MEADOW, Layton: UTRC01525, held by Henry Walker Homes
UINTAH BASIN MEDICAL CENTER - MOB3 among its neighbors
16 discharge permits are in the Coal Mine Basin-Ashley Creek subwatershed (HUC 140600020302); UTRC01515 is one. Its county: 60, 0 major; UTRC01515 is minor permit.
Other permits in the Coal Mine Basin-Ashley Creek subwatershed (HUC 140600020302)
- 100 NORTH UTILITY RECONSTRUCTION, Vernal: UTRC12386, minor, term to 2027-03-12
- ASHLEY NATIONAL FOREST, Vernal: UTG170066, minor, term to 2016-10-30
- CAPPS AUTO WREKING, Vernal: UTR265743, minor, term to 2016-12-31
- DOWELL - SCHLUMBERGER, Vernal: UTR000206, minor, term to 1997-09-30
- FOSSIL COVE, Vernal: UTRC11764, minor, term to 2026-10-13
- HALLIBURTON ENERGY SERVICES INC., Vernal: UTR000184, minor, term to 2009-12-31
- HALLIBUTON ENGERY SERVICES INC, Vernal: UTR000591, minor, term to 2009-12-31
- PIN 15661- 2500 W; 1500 NORTH TO 2500 NORTH F-LC47(19), Maeser: UTRC08486, minor, term to 2025-03-17
- SEEP RIDGE ROAD SEGMENT 3, Vernal: UTR359013, minor, term to 2012-11-03
- UINTAH COUNTY ASPAULT PLANT, Vernal: UTR000645, minor, term to 2023-12-31
Identity
| Facility | UINTAH BASIN MEDICAL CENTER - MOB3 |
|---|---|
| Permittee | Westland Construction |
| NPDES ID | UTRC01515 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 27, 2020 |
| Expires | October 26, 2021 |
| Agency | UTDEQ |
| Address | Vernal, UT 84078 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Coal Mine Basin-Ashley Creek (HUC 140600020302) |
NPDES UTRC01515: effluent limits and exceedances
UINTAH BASIN MEDICAL CENTER - MOB3 (NPDES UTRC01515): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC01515: no pollutant row on file.
NPDES UTRC01515: inspections, violations and enforcement
NPDES UTRC01515 (UINTAH BASIN MEDICAL CENTER - MOB3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC01515
NPDES UTRC01515: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC01515
NPDES UTRC01515: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.