NPDES UTRC01695 · Clean Water Act
HILLS AT SANTA CLARA PHASE 3- LOTS 301-326, Santa Clara, UT: NPDES UTRC01695 discharge permit, effluent exceedances, inspections, penalties
HILLS AT SANTA CLARA PHASE 3- LOTS 301-326, Santa Clara, Utah: General permit coverage UTRC01695, held by Desert Mountain Construction/Brothers Keeper/REI/Todd Smith; Construction stormwater; Administratively continued; issued November 29, 2020, term to November 28, 2021, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 1,206 were issued before UTRC01695.
Coverages issued nearest UTRC01695
- 2020-11-24: CHATEAUS AT RIVERWOOD ESTATES #9, La Verkin: UTRH01780, held by Desert Willow Custom Homes
- 2020-11-24: LOT 104 RAWSON RANCH, Hooper: UTRH01783, held by Marquee Homes Inc
- 2020-11-25: DAYBREAK STARBUCKS, South Jordan: UTRC01690, held by Stout Building Contractors
- 2020-11-25: 472 E SELMAN RIDGE, Salem: UTRH01788, held by Michael Butler
- 2020-11-25: 36 CULINARY WATER LINE REPLACEMENT PROJECT, American Fork: UTRH01789, held by American Fork City
- 2020-11-29: STONE CLIFF LOT 1018, St. George: UTRH01387, held by Jenson Construction LC
- 2020-11-29: HILLS AT SANTA CLARA PHASE 3, Santa Clara: UTRH01794, held by Desert Mountain Construction/Brothers Keeper
- 2020-11-30: FORT DOUGLAS 3 MG TANK ADDITION PROJECT, Salt Lake City: UTRC01699, held by ProBuild Construction, Inc.
- 2020-11-30: RIDGELINE PARK, Nibley: UTRC01704, held by Non-Typical Excavation
- 2020-11-30: SWENSON RESIDENCE, Park City: UTRH01796, held by Daybreak Realty P.C.
HILLS AT SANTA CLARA PHASE 3- LOTS 301-326 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC01695 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
Identity
| Facility | HILLS AT SANTA CLARA PHASE 3- LOTS 301-326 |
|---|---|
| Permittee | Desert Mountain Construction/Brothers Keeper/REI/Todd Smith |
| NPDES ID | UTRC01695 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 29, 2020 |
| Expires | November 28, 2021 |
| Agency | UTDEQ |
| Address | Santa Clara, UT 84765 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC01695: effluent limits and exceedances
HILLS AT SANTA CLARA PHASE 3- LOTS 301-326 (NPDES UTRC01695): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC01695: no pollutant row on file.
NPDES UTRC01695: inspections, violations and enforcement
NPDES UTRC01695 (HILLS AT SANTA CLARA PHASE 3- LOTS 301-326): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC01695
NPDES UTRC01695: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC01695
NPDES UTRC01695: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.