NPDES UTRC02541 · Clean Water Act
SUMMERSET FARMS PHASE 2, Ogden, UT: NPDES UTRC02541 discharge permit, effluent exceedances, inspections, penalties
SUMMERSET FARMS PHASE 2, Ogden, Utah: General permit coverage UTRC02541, held by Edward D Green; Construction stormwater; Administratively continued; issued April 13, 2023, term to April 12, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 5,419 were issued before UTRC02541. Edward D Green holds 2 permits in Utah.
Other permits held by Edward D Green
- LAKESHORE VISTAS SUBDIVISION, Layton: UTRC01650, issued 2020-11-18
Coverages issued nearest UTRC02541
- 2023-04-11: CHAD SMITH, Eden: UTRH06464, held by Valley Design Build, LLC
- 2023-04-12: YOUNG SUBARU, South Ogden: UTRC04729, held by Centerpoint Construction
- 2023-04-12: SR-12 WATERLINE PROJECT 2023, Bryce Canyon City: UTRC06683, held by TruNorth LLC
- 2023-04-12: 320 SNOWS LANE RETREAT, Park City: UTRH05050, held by Lane Myers Construction
- 2023-04-12: PROJECT MOUNTAIN HOME, Huntsville: UTRH06467, held by Bryan Shores
- 2023-04-13: HORSESHOE SOLAR, Dugway: UTRC02568, held by SOLV Energy, LLC
- 2023-04-13: 2100 S 7300 W, MAGNA, UT 84044, Magna: UTRC06690, held by Kim Howell Construction
- 2023-04-13: 725 W CUL WATERLINE REPLACEMENT, Bountiful: UTRC06692, held by Strong Excavation
- 2023-04-13: RIDGELINE - OKELBERRY TRUCKING FLEX, Hurricane: UTRC06693, held by Ridgeline Development Inc.
- 2023-04-13: NIELSEN RESIDENCE, Alpine: UTRH05036, held by Empress Homes LLC
SUMMERSET FARMS PHASE 2 among its neighbors
374 discharge permits are in the Outlet Weber River-Frontal Great Salt Lake subwatershed (HUC 160201020604); UTRC02541 is one.
Other permits in the Outlet Weber River-Frontal Great Salt Lake subwatershed (HUC 160201020604)
- 103 SUNSET FARMS, West Haven: UTRH11527, minor, term to 2027-06-04
- 110 GREEN'S LANDING, Hooper: UTRH07554, minor, term to 2025-06-23
- 114 RAWSON RANCH, Hooper: UTRH04223, minor, term to 2022-11-14
- 12 MACY LANE, West Haven: UTRH10952, minor, term to 2027-02-03
- 125 RAWSON RANCH, Hooper: UTRC04040, minor, term to 2022-12-15
- 125 RAWSON RANCH, Hooper: UTRH10842, minor, term to 2027-01-13
- 127 WINSTON PARK 1942 FITZROY, Ogden: UTRH07090, minor, term to 2024-09-18
- 145 WINSTON PARK 1898 S FITZROY, Ogden: UTRH07091, minor, term to 2024-09-18
- 18 SADDLEWOOD ESTATES, West Haven: UTRH09293, minor, term to 2026-02-27
- 1842 S FITZROY LOT 152, West Haven: UTRH06782, minor, term to 2024-06-29
What stands out
- Its term runs 365 days, April 13, 2023 to April 12, 2024; the term ended 915 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUMMERSET FARMS PHASE 2 |
|---|---|
| Permittee | Edward D Green |
| NPDES ID | UTRC02541 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 13, 2023 |
| Expires | April 12, 2024 |
| Agency | UTDEQ |
| Address | Ogden, UT 84401 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Outlet Weber River-Frontal Great Salt Lake (HUC 160201020604) |
NPDES UTRC02541: effluent limits and exceedances
SUMMERSET FARMS PHASE 2 (NPDES UTRC02541): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC02541: no pollutant row on file.
NPDES UTRC02541: inspections, violations and enforcement
NPDES UTRC02541 (SUMMERSET FARMS PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC02541
NPDES UTRC02541: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC02541
NPDES UTRC02541: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.