NPDES UTRC02942 · Clean Water Act
CLAY BASIN WELL 10, Salt Lake City, UT: NPDES UTRC02942 discharge permit, effluent exceedances, inspections, penalties
CLAY BASIN WELL 10, Salt Lake City, Utah: General permit coverage UTRC02942, held by MountainWest Pipeline; Construction stormwater; Administratively continued; issued June 9, 2022, term to June 9, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,125 were issued before UTRC02942. MountainWest Pipeline holds 3 permits in Utah.
Other permits held by MountainWest Pipeline
- ML48 2023 PIPELINE REPAIRS, Woodruff: UTRC07085, issued 2024-05-17
- CHALK CREEK WELL 6 ABANDONMENT, Coalville: UTRC07262, issued 2023-07-19
Coverages issued nearest UTRC02942
- 2022-06-08: POPEYES PAYSON, UT, Payson: UTRC05233, held by B and L Construction, LLC
- 2022-06-08: MILLBURN RESIDENCE, Bountiful: UTRH05382, held by Brandon Christopher
- 2022-06-08: THE VILLAS AT ROCKWELL RANCH BLOCK 8, American Fork: UTRH05385, held by Red Pine Construction
- 2022-06-08: COFFMAN RESIDENCE, Park City: UTRH05387, held by Brian and Trisha Coffman
- 2022-06-08: LOT 118 SOARING HAWK, Hideout: UTRH05388, held by Millcreek Homes Inc.
- 2022-06-09: PREMIER MEDICAL, Riverton: UTRC02978, held by Milan Investments LLC
- 2022-06-09: CW ROSE, Farmington: UTRC03119, held by CW Urban
- 2022-06-09: HIGHGATE COVE, Roy: UTRC05239, held by Hamlet Development
- 2022-06-09: SUDS N SODA, West Jordan: UTRC05240, held by Denning Construction
- 2022-06-09: WILDFLOWER VILLAGE 8, Saratoga Springs: UTRC05241, held by DAI
CLAY BASIN WELL 10 among its neighbors
2 discharge permits are in the Clay Basin Creek subwatershed (HUC 140401060803); UTRC02942 is one.
Other permits in the Clay Basin Creek subwatershed (HUC 140401060803)
- BROWNS PARK ROAD IMPROVEMENTS; PHASE 6, Dutch John: UTRC12385, minor, term to 2027-03-02
What stands out
- Its term runs 1 year, June 9, 2022 to June 9, 2023; the term ended 1,223 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CLAY BASIN WELL 10 |
|---|---|
| Permittee | MountainWest Pipeline |
| NPDES ID | UTRC02942 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 9, 2022 |
| Expires | June 9, 2023 |
| Agency | UTDEQ |
| Address | Salt Lake City, UT 84023 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Clay Basin Creek (HUC 140401060803) |
NPDES UTRC02942: effluent limits and exceedances
CLAY BASIN WELL 10 (NPDES UTRC02942): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC02942: no pollutant row on file.
NPDES UTRC02942: inspections, violations and enforcement
NPDES UTRC02942 (CLAY BASIN WELL 10): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC02942
NPDES UTRC02942: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC02942
NPDES UTRC02942: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.