NPDES UTRC02980 · Clean Water Act
BEAR LAKE ESCAPE - HORIZONTAL, Garden City, UT: NPDES UTRC02980 discharge permit, effluent exceedances, inspections, penalties
BEAR LAKE ESCAPE - HORIZONTAL, Garden City, Utah: General permit coverage UTRC02980, held by River Valley Development, LLC; Construction stormwater; Administratively continued; issued June 15, 2021, term to June 14, 2022, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,204 were issued before UTRC02980.
Coverages issued nearest UTRC02980
- 2021-06-14: 3RD GENERATION MACHINE, Logan: UTRC02970, held by Kier Construction
- 2021-06-14: PACHOSA & TOLTON RESIDENCE, Park City: UTRH03243, held by McNulty Construction Company
- 2021-06-14: FRANKLIN RESIDENCE, Lehi: UTRH03247, held by Jared Franklin
- 2021-06-15: BANGERTER HOMES TREASURE ESTATES 2, Riverton: UTR387069, held by Bangerter Homes LLC
- 2021-06-15: VILLAGES AT ARROWHEAD PARK - PLAT K, Payson: UTRC00655, held by Eagle Summit Construction
- 2021-06-15: TWIN LAKES TEN PLEX, St. George: UTRH03249, held by Anthony Bocchino
- 2021-06-15: LOT 18 RIVER POINT, Spanish Fork: UTRH03250, held by Home Sweet Home by Mitch
- 2021-06-15: EDGEWATER PARK #1, Syracuse: UTRH03251, held by Brad Wilkes Construction
- 2021-06-16: VISTA RIDGE LOT 10, Lehi: UTRC02982, held by Concord Homes Utah
- 2021-06-16: I80;ECHO CANYON TRUCK PARKING, Echo: UTRC02983, held by Wardell Brothers Construction
BEAR LAKE ESCAPE - HORIZONTAL among its neighbors
6 discharge permits are in the Garden City Canyon-Frontal Bear River subwatershed (HUC 160102010106); UTRC02980 is one.
Other permits in the Garden City Canyon-Frontal Bear River subwatershed (HUC 160102010106)
- 150 SOUTH - 100 WEST TO 200 WEST, Garden City: UTRC05113, minor, term to 2023-05-22
- BEAR LAKE ESCAPE - VERTICAL, Garden City: UTRC03028, minor, term to 2023-06-21
- BIG BEAR, Garden City: UTRC12732, minor, term to 2027-04-28
- PARADISE PARKWAY, Garden City: UTRC02779, minor, term to 2023-05-10
- THE LODGE AT BEAR LAKE, Garden City: UTRC10139, minor, term to 2026-01-14
What stands out
- Its term runs 364 days, June 15, 2021 to June 14, 2022; the term ended 1,554 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BEAR LAKE ESCAPE - HORIZONTAL |
|---|---|
| Permittee | River Valley Development, LLC |
| NPDES ID | UTRC02980 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 15, 2021 |
| Expires | June 14, 2022 |
| Agency | UTDEQ |
| Address | Garden City, UT 84028 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Garden City Canyon-Frontal Bear River (HUC 160102010106) |
NPDES UTRC02980: effluent limits and exceedances
BEAR LAKE ESCAPE - HORIZONTAL (NPDES UTRC02980): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC02980: no pollutant row on file.
NPDES UTRC02980: inspections, violations and enforcement
NPDES UTRC02980 (BEAR LAKE ESCAPE - HORIZONTAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC02980
NPDES UTRC02980: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC02980
NPDES UTRC02980: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.