NPDES UTRC03034 · Clean Water Act
THE HART AT CITY CENTER, Clearfield, UT: NPDES UTRC03034 discharge permit, effluent exceedances, inspections, penalties
THE HART AT CITY CENTER, Clearfield, Utah: General permit coverage UTRC03034, held by MakersLine; Construction stormwater; Effective; issued June 23, 2021, term to June 22, 2022, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,243 were issued before UTRC03034.
Coverages issued nearest UTRC03034
- 2021-06-22: GIBSON RESIDENCE, Farmington: UTRH03278, held by Quilter Construction
- 2021-06-22: LOUMIS PLACE SUBDIVISION, Bluffdale: UTRH03279, held by Brent D. Christensen
- 2021-06-22: BRENNY RESIDENCE, Lehi: UTRH03280, held by Millhaven Homes
- 2021-06-22: HIGHLANDS AT WOLF CREEK - LOT 70, Eden: UTRH03284, held by Scott Greene
- 2021-06-23: ALTA VUE APARTMENTS, Salt Lake City: UTRC03031, held by Rimrock Construction
- 2021-06-23: SOPHIE LANE, West Haven: UTRC03036, held by Dave Winward
- 2021-06-23: NEW BINGHAM HIGHWAY DETENTION PARK, West Jordan: UTRC03038, held by Rhine Construction, LLC
- 2021-06-23: ROCK VIEW ESTATES, Hurricane: UTRC03041, held by Royal T Enterprises, Inc.
- 2021-06-23: PROSPERITY AT OVERLAKE PHASE 1, Tooele: UTRC03042, held by Providence TA, LLC
- 2021-06-23: JENSEN RESIDENCE, Huntsville: UTRH03288, held by Kanyon Construction
THE HART AT CITY CENTER among its neighbors
220 discharge permits are in the West Layton Marshes-Frontal Farmington Bay subwatershed (HUC 160201020505); UTRC03034 is one.
Other permits in the West Layton Marshes-Frontal Farmington Bay subwatershed (HUC 160201020505)
- 140 TUSCANY MEADOWS, Syracuse: UTRH04727, minor, term to 2023-02-21
- 1969 W. 2025 S., SYRACUSE UT 84040, Syracuse: UTRH02166, minor, term to 2022-01-28
- 204 STILLWATER, Syracuse: UTRH02058, minor, term to 2022-01-15
- 2200 S RECONTRUCTION #213, Clearfield: UTRC13187, minor, term to 2027-07-13
- 2600 W ROAD RECONSTRUCTION, Clinton: UTRL00474
- 300 NORTH - 2000 WEST TO 1000 WEST, West Point: UTRC00048, minor, term to 2021-03-03
- 3000 W SEWER REHAB, Syracuse: UTG071842, minor, term to 2024-05-31
- 3000 W SEWER REHAB, Syracuse: UTRL00564
- 3200 WEST, Layton: UTRC12230, minor, term to 2027-01-29
- 4 AVERY GARDENS, Syracuse: UTRH03805, minor, term to 2022-09-07
What stands out
- Its term runs 364 days, June 23, 2021 to June 22, 2022; the term ended 1,546 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE HART AT CITY CENTER |
|---|---|
| Permittee | MakersLine |
| NPDES ID | UTRC03034 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 23, 2021 |
| Expires | June 22, 2022 |
| Agency | UTDEQ |
| Address | Clearfield, UT 84015 |
| Subwatershed | West Layton Marshes-Frontal Farmington Bay (HUC 160201020505) |
NPDES UTRC03034: effluent limits and exceedances
THE HART AT CITY CENTER (NPDES UTRC03034): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC03034: no pollutant row on file.
NPDES UTRC03034: inspections, violations and enforcement
NPDES UTRC03034 (THE HART AT CITY CENTER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC03034
NPDES UTRC03034: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC03034
NPDES UTRC03034: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.