Velarion Records
Free: one email when NPDES UTRC03070 changes. Unsubscribe any time.

NPDES UTRC03070 · Clean Water Act

THE CANYONS AT EAGLE RIDGE, Cedar City, UT: NPDES UTRC03070 discharge permit, effluent exceedances, inspections, penalties

THE CANYONS AT EAGLE RIDGE, Cedar City, Utah: General permit coverage UTRC03070, held by Alex Meisner Construction; Construction stormwater; Administratively continued; issued June 29, 2021, term to June 28, 2022, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,272 were issued before UTRC03070.

Coverages issued nearest UTRC03070

  • 2021-06-28: EVANS RESIDENCE, Mapleton: UTRH03322, held by J & J Services
  • 2021-06-29: WELLSPRINGS SUBDIVISION, Saratoga Springs: UTRC00790, held by Firefly Homes
  • 2021-06-29: DAYBREAK SOUTH, South Jordan: UTRC00876, held by American Homes 4 Rent
  • 2021-06-29: REMAX, South Jordan: UTRC00910, held by Furst Construction
  • 2021-06-29: DEER PARK, American Fork: UTRC03064, held by Red Pine Construction
  • 2021-06-29: TROTTIER RESIDENCE, Huntsville: UTRH03331, held by Craig Trottier
  • 2021-06-29: LAMBERT REMODEL, Springville: UTRH03334, held by Davies Design Build
  • 2021-06-29: LOT 7 SOUTH GATE PUD, South Salt Lake: UTRH03336, held by GRANITE SCHOOL DISTRICT
  • 2021-06-29: RMT LOT 22, Ivins: UTRH03338, held by Brett Kee
  • 2021-06-30: BELTLINE 32 REPLACEMENT, Salt Lake City: UTRC00407, held by Whitaker Construction Company

THE CANYONS AT EAGLE RIDGE among its neighbors

17 discharge permits are in the Shurtz Creek subwatershed (HUC 160300060404); UTRC03070 is one.

Other permits in the Shurtz Creek subwatershed (HUC 160300060404)

What stands out

  • Its term runs 364 days, June 29, 2021 to June 28, 2022; the term ended 1,569 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityTHE CANYONS AT EAGLE RIDGE
PermitteeAlex Meisner Construction
NPDES IDUTRC03070
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJune 29, 2021
ExpiresJune 28, 2022
AgencyUTDEQ
AddressCedar City, UT 84720
SubwatershedShurtz Creek (HUC 160300060404)

NPDES UTRC03070: effluent limits and exceedances

THE CANYONS AT EAGLE RIDGE (NPDES UTRC03070): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC03070: no pollutant row on file.

NPDES UTRC03070: inspections, violations and enforcement

NPDES UTRC03070 (THE CANYONS AT EAGLE RIDGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC03070

NPDES UTRC03070: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC03070

NPDES UTRC03070: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.