NPDES UTRC03504 · Clean Water Act
FOREMAST RIDGE PHASE 3, St. George, UT: NPDES UTRC03504 discharge permit, effluent exceedances, inspections, penalties
FOREMAST RIDGE PHASE 3, St. George, Utah: General permit coverage UTRC03504, held by Jeff MADSEN; Construction stormwater; Effective; issued September 15, 2021, term to September 14, 2022, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 2,651 were issued before UTRC03504.
Coverages issued nearest UTRC03504
- 2021-09-14: ASHMEAD PRIVATE RESIDENCE, Liberty: UTRH03858, held by Pineview Builders, Inc.
- 2021-09-14: LITTLE BALDY LOT 21, Providence: UTRH03859, held by Brandon Major
- 2021-09-15: TEN700 HIGHLAND, Highland: UTRC03469, held by Silver Spur Construction
- 2021-09-15: THE RIDGE TOWNHOMES PH5, Eden: UTRC03500, held by Lewis Homes Inc
- 2021-09-15: ORCHARD HILLS SUBDIVISION, Perry: UTRC03501, held by Alpine Excavating
- 2021-09-15: HEXCEL RETENTION PONDS, West Valley City: UTRC03509, held by Butterfield Builders, LLC
- 2021-09-15: HIDEOUT-LOT 106, Hideout: UTRH03801, held by Hobble Creek Contractors
- 2021-09-15: HIDEOUT-LOT 72, Hideout: UTRH03803, held by Hobble Creek Contractors
- 2021-09-15: WHITEHEAD RESIDENCE, Liberty: UTRH03863, held by Jeremy Jones
- 2021-09-15: LARK RESIDENCE, Highland: UTRH03864, held by Truecraft Construction
FOREMAST RIDGE PHASE 3 among its neighbors
636 discharge permits are in the Middleton Wash-Virgin River subwatershed (HUC 150100080910); UTRC03504 is one.
Other permits in the Middleton Wash-Virgin River subwatershed (HUC 150100080910)
- 1103 ST GEORGE (SG-5-3-10-1103), St. George: UTRH06625, minor, term to 2024-05-17
- 123 CRIMSON VISTA, St. George: UTRH03262, minor, term to 2022-06-17
- 1236 S SIERRA VISTA CIRCLE, St. George: UTRL00265
- 1358 E PONY TRAIL WAY WASHINGTON, UTAH 84780, Washington: UTRH10276, minor, term to 2026-09-04
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03020, minor, term to 2022-06-20
- 1450 EAST ROADWAY EXTENSION, St. George: UTRC03088, minor, term to 2022-07-05
- 29 BOULDERS, St. George: UTRH03475, minor, term to 2022-07-26
- 30 GRAND HEIGHTS, St. George: UTRH03266, minor, term to 2022-06-17
- 34 WESTGATE HILLS, Washington: UTRH05029, minor, term to 2023-04-10
- 3430 E/EZRA LN IMPROVMENTS, St. George: UTRL00727
Identity
| Facility | FOREMAST RIDGE PHASE 3 |
|---|---|
| Permittee | Jeff MADSEN |
| NPDES ID | UTRC03504 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 15, 2021 |
| Expires | September 14, 2022 |
| Agency | UTDEQ |
| Address | St. George, UT 84790 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Middleton Wash-Virgin River (HUC 150100080910) |
NPDES UTRC03504: effluent limits and exceedances
FOREMAST RIDGE PHASE 3 (NPDES UTRC03504): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC03504: no pollutant row on file.
NPDES UTRC03504: inspections, violations and enforcement
NPDES UTRC03504 (FOREMAST RIDGE PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC03504
NPDES UTRC03504: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC03504
NPDES UTRC03504: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.