NPDES UTRC03641 · Clean Water Act
CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2, Saratoga Springs, UT: NPDES UTRC03641 discharge permit, effluent exceedances, inspections, penalties
CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2, Saratoga Springs, Utah: General permit coverage UTRC03641, held by Gerber Construction, Inc.; Construction stormwater; Effective; issued September 28, 2022, term to October 5, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,709 were issued before UTRC03641. Gerber Construction, Inc. holds 3 permits in Utah.
Other permits held by Gerber Construction, Inc.
- MAYFLOWER MOUNTAIN RESORT TANK SITE - 1, Park City: UTR394455, issued 2019-06-29
- MOUNTAIN DELL DAM - REBUILDING OF OUTLET GATES AND VALVES, Salt Lake City: UTRC08856, issued 2024-05-16
Coverages issued nearest UTRC03641
- 2022-09-27: RULON WHITE STORAGE, Ogden: UTRC05888, held by E.K. Bailey Construction
- 2022-09-27: HATFIELD HOME, Springville: UTRH05874, held by Jory Hatfield
- 2022-09-28: RED WATERS, Washington: UTRC01302, held by Ence Homes
- 2022-09-28: ST. GEORGE WATER TREATMENT PLANT, St. George: UTRC01396, held by Sletten Construction Companies
- 2022-09-28: THE LANE, Centerville: UTRC03632, held by NU Construction, LLC
- 2022-09-28: ARBOR PARK, Magna: UTRC05887, held by Wasatch Commercial Builders
- 2022-09-28: WS202, Saratoga Springs: UTRH04037, held by Development and excavations Experts
- 2022-09-28: RHONE 21, St. George: UTRH05881, held by Ben Shakespeare
- 2022-09-28: 340 N 1900 W, Marriott-Slaterville: UTRH05882, held by C S Construction
- 2022-09-28: SE17, Providence: UTRH05885, held by OLO Builders Logan
CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2 among its neighbors
588 discharge permits are in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002); UTRC03641 is one.
Other permits in the Outlet Dry Creek-Jordan River subwatershed (HUC 160202011002)
- 10267 MOUNTAIN RIDGE (HANSEN), Highland: UTRH05540, minor, term to 2023-07-08
- 10665 N ALPINE HWY, Highland: UTRH00976, minor, term to 2021-08-06
- 10700 COMMERCIAL LOT 43 AND LOT 44, Highland: UTRC13181, minor, term to 2027-07-08
- 1100 WEST 350 SOUTH, American Fork: UTR397831, minor, term to 2020-12-02
- 130 SEASONS EST, Lehi: UTRH07171, minor, term to 2024-10-02
- 200 SERIES MANEUVER REPAIR (FY25), Bluffdale: UTRL00647
- 2022-23 ASD SCHOOL HOUSE, American Fork: UTRC05336, minor, term to 2023-06-26
- 2100 N MVC TO I-15, Lehi: UTRC12155, minor, term to 2027-01-13
- 2100 N MVC TO I-15 EXTERNAL SITES, Lehi: UTRC12174, minor, term to 2027-01-15
- 2645 N CENTER ST, Lehi: UTRH08574, minor, term to 2025-09-09
What stands out
- Its term runs 1 year and 7 days, September 28, 2022 to October 5, 2023; the term ended 1,105 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2 |
|---|---|
| Permittee | Gerber Construction, Inc. |
| NPDES ID | UTRC03641 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 28, 2022 |
| Expires | October 5, 2023 |
| Agency | UTDEQ |
| Address | Saratoga Springs, UT 84043 |
| Subwatershed | Outlet Dry Creek-Jordan River (HUC 160202011002) |
NPDES UTRC03641: effluent limits and exceedances
CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2 (NPDES UTRC03641): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC03641: no pollutant row on file.
NPDES UTRC03641: inspections, violations and enforcement
NPDES UTRC03641 (CWP NORTHSHORE TERMINAL RESERVOIR PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC03641
NPDES UTRC03641: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC03641
NPDES UTRC03641: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.