NPDES UTRC04130 · Clean Water Act
HERITAGE EAST SUBDIVISION PHASE 1 & 2, Clearfield, UT: NPDES UTRC04130 discharge permit, effluent exceedances, inspections, penalties
HERITAGE EAST SUBDIVISION PHASE 1 & 2, Clearfield, Utah: General permit coverage UTRC04130, held by Fieldstone Heritage East LLC; Construction stormwater; Effective; issued December 8, 2022, term to January 5, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,951 were issued before UTRC04130.
Coverages issued nearest UTRC04130
- 2022-12-05: WEBER RESIDENCE, Millcreek: UTRH06101, held by Shelby Homes
- 2022-12-05: BRAD HANSEN CABIN, Hyrum: UTRH06102, held by Braden Reeder
- 2022-12-06: EAGLE POINTE PHASE 20 ( RUPP SUBDIVISION), North Salt Lake: UTRC06134, held by Daryl Fullmer- F2 Excavation
- 2022-12-07: LOT 18, Eden: UTRH04185, held by Pamela Russell
- 2022-12-07: RETREAT AT WOLF CREEK LOT 16, Eden: UTRH06110, held by Manrique Robert and Catherine Pinder
- 2022-12-08: STATE BANK OF SOUTHERN UTAH-WASHINGTON FIELDS BRANCH, St. George: UTRC06143, held by Watts Construction
- 2022-12-08: EAGLE MOUNTAIN - 4 MG TANK, Eagle Mountain: UTRC06144, held by FX Construction
- 2022-12-08: WPI - PLAT F, Saratoga Springs: UTRC06145, held by Complete Contracting Company
- 2022-12-08: MERRILL RESIDENCE, Vineyard: UTRH06112, held by Black Bird Construction
- 2022-12-08: RESERVE OF ENTRADA A58, Ivins: UTRH06113, held by Cedar Pointe Homes, LLC
HERITAGE EAST SUBDIVISION PHASE 1 & 2 among its neighbors
220 discharge permits are in the West Layton Marshes-Frontal Farmington Bay subwatershed (HUC 160201020505); UTRC04130 is one.
Other permits in the West Layton Marshes-Frontal Farmington Bay subwatershed (HUC 160201020505)
- 140 TUSCANY MEADOWS, Syracuse: UTRH04727, minor, term to 2023-02-21
- 1969 W. 2025 S., SYRACUSE UT 84040, Syracuse: UTRH02166, minor, term to 2022-01-28
- 204 STILLWATER, Syracuse: UTRH02058, minor, term to 2022-01-15
- 2200 S RECONTRUCTION #213, Clearfield: UTRC13187, minor, term to 2027-07-13
- 2600 W ROAD RECONSTRUCTION, Clinton: UTRL00474
- 300 NORTH - 2000 WEST TO 1000 WEST, West Point: UTRC00048, minor, term to 2021-03-03
- 3000 W SEWER REHAB, Syracuse: UTG071842, minor, term to 2024-05-31
- 3000 W SEWER REHAB, Syracuse: UTRL00564
- 3200 WEST, Layton: UTRC12230, minor, term to 2027-01-29
- 4 AVERY GARDENS, Syracuse: UTRH03805, minor, term to 2022-09-07
What stands out
- Its term runs 1 year and 28 days, December 8, 2022 to January 5, 2024; the term ended 1,013 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HERITAGE EAST SUBDIVISION PHASE 1 & 2 |
|---|---|
| Permittee | Fieldstone Heritage East LLC |
| NPDES ID | UTRC04130 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 8, 2022 |
| Expires | January 5, 2024 |
| Agency | UTDEQ |
| Address | Clearfield, UT 84016 |
| Subwatershed | West Layton Marshes-Frontal Farmington Bay (HUC 160201020505) |
NPDES UTRC04130: effluent limits and exceedances
HERITAGE EAST SUBDIVISION PHASE 1 & 2 (NPDES UTRC04130): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC04130: no pollutant row on file.
NPDES UTRC04130: inspections, violations and enforcement
NPDES UTRC04130 (HERITAGE EAST SUBDIVISION PHASE 1 & 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC04130
NPDES UTRC04130: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC04130
NPDES UTRC04130: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.