NPDES UTRC04305 · Clean Water Act
PAINTED SANDS PHASE 3, Hurricane, UT: NPDES UTRC04305 discharge permit, effluent exceedances, inspections, penalties
PAINTED SANDS PHASE 3, Hurricane, Utah: General permit coverage UTRC04305, held by Keith Kap & Sons Excavating; Construction stormwater; Administratively continued; issued January 31, 2022, term to January 30, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,318 were issued before UTRC04305. Keith Kap & Sons Excavating holds 6 permits in Utah.
Other permits held by Keith Kap & Sons Excavating
- THE VILLAS AT GREEN MANOR, Kaysville: UTRC00052, issued 2021-02-09
- THE PARKWAY, Kaysville: UTRC00987, issued 2020-08-07
- TC GAILEY SUBDIVISION, Ogden: UTRC06058, issued 2022-11-10
- NIELSEN CROSSING PH1, West Point: UTRC11336, issued 2025-07-28
- CANYON VIEW COMMONS, Mountain Green: UTRC11512, issued 2025-08-26
Coverages issued nearest UTRC04305
- 2022-01-31: BELT LINE 7 (WBS#79073.52), Salt Lake City: UTRC04284, held by Questar Gas Company dba Dominion Energy Utah
- 2022-01-31: INTERMOUNTAIN SARATOGA SPRINGS FED/ASC, Saratoga Springs: UTRC04291, held by Jacobsen Construction
- 2022-01-31: COPPERWOOD, Harrisville: UTRC04298, held by Jake Thompson
- 2022-01-31: YOUNG POWERSPORTS CENTERVILLE, UT, Centerville: UTRC04303, held by Centerpoint Construction
- 2022-01-31: SKYLINE RIDGE PHASE 2 PLAT 6, Eagle Mountain: UTRC04304, held by Bach Land and Development
- 2022-01-31: TOPGOLF VINEYARD, Vineyard: UTRC04306, held by ARCO/Murray
- 2022-01-31: MARY'S MEADOW, Layton: UTRC04307, held by Henry Walker Homes
- 2022-01-31: WHISPERING HAWK - COOPER'S HAWK, Kamas: UTRC04308, held by Big-D Signature
- 2022-01-31: BUDGE FARMS PHASE 2, Pleasant View: UTRC04312, held by BUDGE FARMS COMMUNITY LLC
- 2022-01-31: PROVIDENCE HEIGHTS 25, Providence: UTRH04595, held by Duke Building Co
PAINTED SANDS PHASE 3 among its neighbors
100 discharge permits are in the Lower Gould Wash subwatershed (HUC 150100080902); UTRC04305 is one.
Other permits in the Lower Gould Wash subwatershed (HUC 150100080902)
- 100 N; 200 W TO SR9 & 100 E; SR9 TO 100 N, Hurricane: UTRC09945, minor, term to 2025-11-25
- 19 MOUNTAIN VIEW, Hurricane: UTRH11253, minor, term to 2027-04-13
- 20 MOUNTAIN VIEW ESTATES, Hurricane: UTRH11384, minor, term to 2027-05-07
- 25 MOUNTAIN VIEW ESTATES, Hurricane: UTRH11770, minor, term to 2027-07-26
- 26 MOUNTAIN VIEW, Hurricane: UTRH11247, minor, term to 2027-04-12
- 5 MOUNTAIN VIEW ESTATES, Hurricane: UTRH11412, minor, term to 2027-05-13
- 700 W ROADWAY (100 N TO 400 N), Hurricane: UTRC06448, minor, term to 2024-02-23
- 920 WEST LOT 2B, Hurricane: UTRC12274, minor, term to 2027-02-08
- BALLARD AUTO WRECKING AND REPAIR, Hurricane: UTR259529, minor, term to 2023-12-31
- BANDED RIDGE 16, St. George: UTRH10457, minor, term to 2026-10-06
Identity
| Facility | PAINTED SANDS PHASE 3 |
|---|---|
| Permittee | Keith Kap & Sons Excavating |
| NPDES ID | UTRC04305 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 31, 2022 |
| Expires | January 30, 2023 |
| Agency | UTDEQ |
| Address | Hurricane, UT 84737 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Gould Wash (HUC 150100080902) |
NPDES UTRC04305: effluent limits and exceedances
PAINTED SANDS PHASE 3 (NPDES UTRC04305): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC04305: no pollutant row on file.
NPDES UTRC04305: inspections, violations and enforcement
NPDES UTRC04305 (PAINTED SANDS PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC04305
NPDES UTRC04305: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC04305
NPDES UTRC04305: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.