NPDES UTRC04366 · Clean Water Act
SCC SKYLINE RIDGE PHASE 2-3, Tooele, UT: NPDES UTRC04366 discharge permit, effluent exceedances, inspections, penalties
SCC SKYLINE RIDGE PHASE 2-3, Tooele, Utah: General permit coverage UTRC04366, held by SAMUEL CLEGG CONTRUCTION; Construction stormwater; Administratively continued; issued February 8, 2022, term to February 7, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,373 were issued before UTRC04366.
Coverages issued nearest UTRC04366
- 2022-02-07: KACHINA CLIFFS #31, St. George: UTRH04636, held by Jensen & Sons
- 2022-02-07: PORTER ROCKWELL ESTATES, Draper: UTRH04637, held by Rob Burton
- 2022-02-08: RED CLIFFS MALL EXTERIOR RENOVATION, St. George: UTRC04360, held by R&O Construction Co.
- 2022-02-08: REPAIR AIRFIELD PRIMARY UG ELECTRICAL DISTRIBUTION LINE B5330, Hill Afb: UTRC04361, held by HHI Corporation
- 2022-02-08: LOT 26 VISTA MEADOWS, Bluffdale: UTRC04362, held by Lighthouse Custom Homes
- 2022-02-08: 85984.23 FL 012 REPLACEMENT ORANGE ST. TO N. TEMPLE, Salt Lake City: UTRC04368, held by Questar Gas Company dba Dominion Energy Utah
- 2022-02-08: HALLAGAN, Ivins: UTRH04639, held by Greg Ence Construction
- 2022-02-08: LOT 1 GRANITE GLEN SUBDIVISION, Sandy: UTRH04640, held by True Homes LLC
- 2022-02-09: NEW CITY PLAZA RENOVATION, Salt Lake City: UTRC04369, held by Kier Construction
- 2022-02-09: US-40; WASATCH CO LINE TO SR-32 PVMT & STRUCTURES, Heber City: UTRC04372, held by Utah Department of Transportation
SCC SKYLINE RIDGE PHASE 2-3 among its neighbors
99 discharge permits are in the Middle Canyon subwatershed (HUC 160203040402); UTRC04366 is one.
Other permits in the Middle Canyon subwatershed (HUC 160203040402)
- 424 PV, Tooele: UTRH02555, minor, term to 2022-03-14
- 426 PV, Tooele: UTRH02569, minor, term to 2022-03-14
- AFCU TOOELE, Tooele: UTRC12703, minor, term to 2027-04-23
- APTUS, Tooele: UTR000135, minor, term to 1997-09-30
- BEVAN ESTATES, Tooele: UTRC02684, minor, term to 2024-04-29
- CAFE ZUPAS TOOELE SHELL, Tooele: UTRC12298, minor, term to 2027-02-12
- CANYON SPRINGS PHASE 1, Tooele: UTRC12170, minor, term to 2027-01-14
- CARR FORK & IS&R TOOELE SMELTER, Tooele: UTR000030, minor, term to 2002-12-31
- CHASE BANK TOOELE, Tooele: UTRC11775, minor, term to 2026-10-14
- CHILI'S TOOELE #1679, Tooele: UTRC09915, minor, term to 2025-11-19
Identity
| Facility | SCC SKYLINE RIDGE PHASE 2-3 |
|---|---|
| Permittee | SAMUEL CLEGG CONTRUCTION |
| NPDES ID | UTRC04366 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 8, 2022 |
| Expires | February 7, 2023 |
| Agency | UTDEQ |
| Address | Tooele, UT 84074 |
| Subwatershed | Middle Canyon (HUC 160203040402) |
NPDES UTRC04366: effluent limits and exceedances
SCC SKYLINE RIDGE PHASE 2-3 (NPDES UTRC04366): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC04366: no pollutant row on file.
NPDES UTRC04366: inspections, violations and enforcement
NPDES UTRC04366 (SCC SKYLINE RIDGE PHASE 2-3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC04366
NPDES UTRC04366: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC04366
NPDES UTRC04366: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.