Velarion Records
Free: one email when NPDES UTRC04621 changes. Unsubscribe any time.

NPDES UTRC04621 · Clean Water Act

TUWEAP POINT PHASE 2 - LOT 30, St. George, UT: NPDES UTRC04621 discharge permit, effluent exceedances, inspections, penalties

TUWEAP POINT PHASE 2 - LOT 30, St. George, Utah: General permit coverage UTRC04621, held by Jackson & Haylee Ream; Construction stormwater; Administratively continued; issued March 16, 2022, term to March 15, 2023, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,578 were issued before UTRC04621.

Coverages issued nearest UTRC04621

TUWEAP POINT PHASE 2 - LOT 30 among its neighbors

160 discharge permits are in the Snow Canyon subwatershed (HUC 150100080807); UTRC04621 is one.

Other permits in the Snow Canyon subwatershed (HUC 150100080807)

Identity

FacilityTUWEAP POINT PHASE 2 - LOT 30
PermitteeJackson & Haylee Ream
NPDES IDUTRC04621
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 16, 2022
ExpiresMarch 15, 2023
AgencyUTDEQ
AddressSt. George, UT 84774
SubwatershedSnow Canyon (HUC 150100080807)

NPDES UTRC04621: effluent limits and exceedances

TUWEAP POINT PHASE 2 - LOT 30 (NPDES UTRC04621): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC04621: no pollutant row on file.

NPDES UTRC04621: inspections, violations and enforcement

NPDES UTRC04621 (TUWEAP POINT PHASE 2 - LOT 30): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC04621

NPDES UTRC04621: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC04621

NPDES UTRC04621: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.