Clean Water Act discharge permit · NPDES UTRC04629

EASTSIDE VIEW PHASE 1-2, Garland, UT: NPDES UTRC04629 discharge permit, effluent exceedances, inspections, penalties

EASTSIDE VIEW PHASE 1-2, held by Grover Excavation, holds NPDES permit UTRC04629. EPA’s file records it issued March 17, 2022 and expiring March 16, 2023. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for EASTSIDE VIEW PHASE 1-2: its NPDES ID, its permit type and status, its dates, its address in Garland, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRC04629.

What stands out

  • Its term runs 364 days, March 17, 2022 to March 16, 2023; the term ended 1,279 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedEASTSIDE VIEW PHASE 1-2
Permittee as filedGrover Excavation
NPDES IDUTRC04629
Permit statusAdministratively continued (past its expiration date and still in force until reissued)
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedMarch 17, 2022
Expiration dateMarch 16, 2023
Issuing agencyUTDEQ
AddressGarland, UT 84312
Receiving water impaired303(D) Listed
SubwatershedOutlet Malad River (HUC 160102040307)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRC04629.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRC04629.

Inspections

EPA’s inspection file holds no inspection for NPDES UTRC04629.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES UTRC04629.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRC04629.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRC04629 there.

EASTSIDE VIEW PHASE 1-2, Garland, Utah: Coverage under a general permit UTRC04629, held by Grover Excavation; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued March 17, 2022, term to March 16, 2023, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,600 were issued before UTRC04629. Grover Excavation holds 14 permits in Utah.

Other permits held by Grover Excavation

Coverages issued nearest UTRC04629

EASTSIDE VIEW PHASE 1-2 among its neighbors

21 discharge permits are in the Outlet Malad River subwatershed (HUC 160102040307); UTRC04629 is one.

Other permits in the Outlet Malad River subwatershed (HUC 160102040307)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The EASTSIDE VIEW PHASE 1-2 storm water construction permit, held by Grover Excavation in Garland, Utah, is one of 9 such permits on the register for that city, and it sits within the Outlet Malad River subwatershed, which contains 21 NPDES permits, this one included. It records no pollutants under a numeric limit and no effluent exceedances, and 0.0% of the 9 Garland storm water construction permits carry a violation on file.