Clean Water Act discharge permit · NPDES UTRC04926
THE YARD A PHASE 3, Vineyard, UT: NPDES UTRC04926 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
THE YARD A PHASE 3, held by 600 Mill LLC, holds NPDES permit UTRC04926. EPA’s file records it issued April 28, 2022 and expiring April 27, 2023. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for THE YARD A PHASE 3: its NPDES ID, its permit type and status, its dates, its address in Vineyard, Utah. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES UTRC04926.
What stands out
- Its term runs 364 days, April 28, 2022 to April 27, 2023; the term ended 1,266 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | THE YARD A PHASE 3 |
|---|---|
| Permittee as filed | 600 Mill LLC |
| NPDES ID | UTRC04926 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 28, 2022 |
| Expiration date | April 27, 2023 |
| Issuing agency | UTDEQ |
| Address | Vineyard, UT 84059 |
| Subwatershed | Dry Canyon-Frontal Utah Lake (HUC 160202010804) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES UTRC04926.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES UTRC04926.
Inspections
EPA’s inspection file holds no inspection for NPDES UTRC04926.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES UTRC04926.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, UTRC04926.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID UTRC04926 there.
THE YARD A PHASE 3, Vineyard, Utah: Coverage under a general permit UTRC04926, held by 600 Mill LLC; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued April 28, 2022, term to April 27, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,865 were issued before UTRC04926.
Coverages issued nearest UTRC04926
- 2022-04-27: VAUGHT 11, Park City: UTRH05152, held by RCO Construction Services LLC
- 2022-04-27: ALEMORA, Hooper: UTRH05155, held by Mac builders
- 2022-04-27: KEVIN SMITH RESIDENCE, Draper: UTRH05157, held by Brandon Bodell Construction
- 2022-04-28: JORDANELLE RIDGE VILLAGE II PH1A, Heber City: UTRC02324, held by JWright Companies
- 2022-04-28: MAJESTIC FIELDS, Washington: UTRC02361, held by Feller Enterprises
- 2022-04-28: WILLOW CREEK INDUSTRIAL PROPERTIES #3, LLC, Draper: UTRC04933, held by Willow Creek Industrial Properties #3, LLC
- 2022-04-28: TOWNS ON MAIN, Kaysville: UTRC04934, held by Destination Homes
- 2022-04-28: CLEARFIELD JUNCTION, Clearfield: UTRC04935, held by DG Construction
- 2022-04-28: LOT 1011 A EAGLEWOOD COVE, North Salt Lake: UTRC04936, held by Spencer Stephens
- 2022-04-28: POD 17, Herriman: UTRC04939, held by Wasatch Commercial Builders
THE YARD A PHASE 3 among its neighbors
208 discharge permits are in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804); UTRC04926 is one.
Other permits in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804)
- 162 W 800 S, Orem: UTRH03871, minor, term to 2022-09-15
- 2023 OREM CITY CONCRETE PROJECT - VARIOUS LOCATIONS, Orem: UTRL00498
- ABBEY ROAD, Orem: UTRC03795, minor, term to 2024-11-02
- ABBEY ROAD LOT 13, Orem: UTRH11220, minor, term to 2027-04-05
- ACADIA HEIGHTS, Orem: UTRC10764, minor, term to 2026-04-24
- ADHESIVES TECHNOLOGY CORPORATION, Orem: UTNX00700, minor, term to 2030-09-25
- ALLIE & STACY RESIDENCE, Vineyard: UTRH05813, minor, term to 2023-09-08
- ALMA MILES RESIDENCE, Orem: UTRH05948, minor, term to 2023-10-11
- ALTUS GENEVA RETAIL LOT 203 - VINEYARD, Vineyard: UTRC09202, minor, term to 2025-07-11
- ARCHIBALD RESIDENCE OREM, Orem: UTRH11543, minor, term to 2027-06-07
Nearby on the register
- Discharge permits in Vineyard
- Every permit record in Vineyard, A to Z
- Discharge permits in Utah
- Every permit record in Utah, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
THE YARD A PHASE 3 is one of 70 storm water construction permits on EPA's NPDES register in Vineyard, and 0.0% of those permits have a violation on file. Of the 69 storm water construction permits in Vineyard, 30.4% have an earlier issue date than this permit, and it is one of 208 NPDES permits in the Dry Canyon-Frontal Utah Lake subwatershed.