Velarion Records
Free: one email when NPDES UTRC04945 changes. Unsubscribe any time.

NPDES UTRC04945 · Clean Water Act

BASTIAN, Orem, UT: NPDES UTRC04945 discharge permit, effluent exceedances, inspections, penalties

BASTIAN, Orem, Utah: General permit coverage UTRC04945, held by Davies Design Build; Construction stormwater; Administratively continued; issued May 2, 2022, term to May 1, 2023, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 3,881 were issued before UTRC04945. Davies Design Build holds 26 permits in Utah.

Other permits held by Davies Design Build

Coverages issued nearest UTRC04945

BASTIAN among its neighbors

208 discharge permits are in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804); UTRC04945 is one.

Other permits in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804)

Identity

FacilityBASTIAN
PermitteeDavies Design Build
NPDES IDUTRC04945
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMay 2, 2022
ExpiresMay 1, 2023
AgencyUTDEQ
AddressOrem, UT 84057
Receiving water impaired303(D) Listed
SubwatershedDry Canyon-Frontal Utah Lake (HUC 160202010804)

NPDES UTRC04945: effluent limits and exceedances

BASTIAN (NPDES UTRC04945): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC04945: no pollutant row on file.

NPDES UTRC04945: inspections, violations and enforcement

NPDES UTRC04945 (BASTIAN): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC04945

NPDES UTRC04945: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC04945

NPDES UTRC04945: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.