GATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH), Spanish Fork, UT: NPDES UTRC05104 discharge permit, effluent exceedances, inspections, penalties

GATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH), Spanish Fork, Utah: General permit coverage UTRC05104, held by Summit Line Construction; Construction stormwater; Administratively continued; issued May 19, 2025, term to May 19, 2026, by UTDEQ.

Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 9,373 were issued before UTRC05104. Summit Line Construction holds 6 permits in Utah.

Other permits held by Summit Line Construction

Coverages issued nearest UTRC05104

GATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH) among its neighbors

12 discharge permits are in the Lower Soldier Creek subwatershed (HUC 160202020107); UTRC05104 is one.

Other permits in the Lower Soldier Creek subwatershed (HUC 160202020107)

What stands out

  • Its term runs 1 year, May 19, 2025 to May 19, 2026; the term ended 148 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityGATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH)
PermitteeSummit Line Construction
NPDES IDUTRC05104
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMay 19, 2025
ExpiresMay 19, 2026
AgencyUTDEQ
AddressSpanish Fork, UT 84066
Receiving water impaired303(D) Listed
SubwatershedLower Soldier Creek (HUC 160202020107)

NPDES UTRC05104: effluent limits and exceedances

GATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH) (NPDES UTRC05104): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES UTRC05104: no pollutant row on file.

NPDES UTRC05104: inspections, violations and enforcement

NPDES UTRC05104 (GATEWAY SOUTH TRANSMISSION LINE ELEMENTS C/D (UTAH)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES UTRC05104

NPDES UTRC05104: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES UTRC05104

NPDES UTRC05104: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.