NPDES UTRC05920 · Clean Water Act
LEJTMAN MAIN HOUSE, Eden, UT: NPDES UTRC05920 discharge permit, effluent exceedances, inspections, penalties
LEJTMAN MAIN HOUSE, Eden, Utah: General permit coverage UTRC05920, held by CD Construction, Inc.; Construction stormwater; Administratively continued; issued October 6, 2022, term to October 5, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,741 were issued before UTRC05920. CD Construction, Inc. holds 2 permits in Utah.
Other permits held by CD Construction, Inc.
- LEJTMAN MOUNTAIN SIDE VISTA, Eden: UTRH03767, issued 2021-09-01
Coverages issued nearest UTRC05920
- 2022-10-05: NGUYEN CABIN, Salt Lake City: UTRH05914, held by G1-Construction
- 2022-10-05: LOT 114 NORTHVIEW, North Ogden: UTRH05915, held by Spencer Stephens
- 2022-10-05: DUNYON- CRIMSON RIDGE, Eden: UTRH05916, held by Jen Dunyon
- 2022-10-06: AFCU OPS BUILDING, Riverdale: UTRC05917, held by Layton Construction
- 2022-10-06: GABBOTT'S ROW, Salt Lake City: UTRC05919, held by Bonneville Builders
- 2022-10-06: WING RESIDENCE - WING ESTATES PLAT A, Provo: UTRH05917, held by Green Tech Construction
- 2022-10-06: BERNARDO HOME, American Fork: UTRH05919, held by Lakeridge Construction
- 2022-10-07: LOT 4 SILVER HILL LODGE SUBDIVISION, Brighton: UTRC03651, held by Tri City Construction
- 2022-10-07: FEEDERLINE 13 WEST VALLEY SEGMENT 2 (WBS#86460.23), West Valley City: UTRC03807, held by Questar Gas Company d.b.a Dominion Energy Utah
- 2022-10-07: SAND HOLLOW TOWNHOMES PH 2, Hurricane: UTRC05924, held by JP Excavating
LEJTMAN MAIN HOUSE among its neighbors
128 discharge permits are in the Pineview Reservoir-Middle Fork Ogden River subwatershed (HUC 160201020303); UTRC05920 is one.
Other permits in the Pineview Reservoir-Middle Fork Ogden River subwatershed (HUC 160201020303)
- 1 WESTWOOD, Eden: UTRC04096, minor, term to 2022-12-29
- 11 HIDDEN HAVEN ESTATES, Eden: UTRC03189, minor, term to 2022-07-20
- 110 SHELTER HILL, Eden: UTRH11025, minor, term to 2027-05-17
- 114 SHELTER HILL, Eden: UTRH11352, minor, term to 2027-05-03
- 181S 9200E, Huntsville: UTRH11568, minor, term to 2027-06-14
- 2 WESTWOOD, Eden: UTRH04509, minor, term to 2023-01-13
- 2395 NORTH SIERRA DRIVE, Eden: UTRH05962, minor, term to 2023-10-18
- 3 WESTWOOD, Eden: UTRC04097, minor, term to 2022-12-29
- 4 WESTWOOD, Eden: UTRH04863, minor, term to 2023-03-15
- 411 S 7900 E - LOT #10, Huntsville: UTRC11391, minor, term to 2026-08-04
What stands out
- Its term runs 364 days, October 6, 2022 to October 5, 2023; the term ended 1,076 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LEJTMAN MAIN HOUSE |
|---|---|
| Permittee | CD Construction, Inc. |
| NPDES ID | UTRC05920 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 6, 2022 |
| Expires | October 5, 2023 |
| Agency | UTDEQ |
| Address | Eden, UT 84310 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Pineview Reservoir-Middle Fork Ogden River (HUC 160201020303) |
NPDES UTRC05920: effluent limits and exceedances
LEJTMAN MAIN HOUSE (NPDES UTRC05920): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC05920: no pollutant row on file.
NPDES UTRC05920: inspections, violations and enforcement
NPDES UTRC05920 (LEJTMAN MAIN HOUSE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC05920
NPDES UTRC05920: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC05920
NPDES UTRC05920: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.