NPDES UTRC05923 · Clean Water Act
VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE, Vineyard, UT: NPDES UTRC05923 discharge permit, effluent exceedances, inspections, penalties
VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE, Vineyard, Utah: General permit coverage UTRC05923, held by Landmark Excavating; Construction stormwater; Effective; issued October 8, 2022, term to October 7, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,751 were issued before UTRC05923. Landmark Excavating holds 25 permits in Utah.
Other permits held by Landmark Excavating
- PIONEER CROSSING IMPROVEMENTS PHASE 2, Saratoga Springs: UTG072166, issued 2026-08-12
- HEBER BROOKSIDE, Heber City: UTRC01048, issued 2020-08-14
- N WHITING FARMS PHASE 1, Mapleton: UTRC02001, issued 2021-01-28
- THE HOLLOWS SUBDIVISION, Highland: UTRC02251, issued 2021-03-05
- DOWNTOWN VINEYARD, Vineyard: UTRC02466, issued 2025-03-17
- SLATE CANYON VIEW, Provo: UTRC03457, issued 2021-09-13
- WESTFIELD CENTRAL, Springville: UTRC04082, issued 2022-11-29
- SPANISH FORK BUSINESS PARK, Spanish Fork: UTRC04546, issued 2022-03-07
- HERRIMAN MAIN ST. RECONSTRUCT, Herriman: UTRC06284, issued 2023-01-24
- SR-289; MP 0.88 CONSTRUCT ROUNDABOUT, Cedar City: UTRC10988, issued 2025-06-02
Coverages issued nearest UTRC05923
- 2022-10-07: LOT 4 SILVER HILL LODGE SUBDIVISION, Brighton: UTRC03651, held by Tri City Construction
- 2022-10-07: FEEDERLINE 13 WEST VALLEY SEGMENT 2 (WBS#86460.23), West Valley City: UTRC03807, held by Questar Gas Company d.b.a Dominion Energy Utah
- 2022-10-07: SAND HOLLOW TOWNHOMES PH 2, Hurricane: UTRC05924, held by JP Excavating
- 2022-10-07: MCDONALD'S OREM 2, Orem: UTRC05925, held by McDonald's USA LLC
- 2022-10-07: HATCH DEVELOPMENT, South Jordan: UTRC05927, held by D&D Development LLC
- 2022-10-08: WILD UTAH - HOGLE ZOO, Salt Lake City: UTRC05926, held by Sirq Construction
- 2022-10-10: PETERSEN RESIDENCE, Springville: UTRH05931, held by Jensen MM Homes
- 2022-10-10: CASCADE ESTATES LOT 1 PHASE A, Orem: UTRH05932, held by Vanko LLC
- 2022-10-11: JONES COURT, Orem: UTRC03681, held by Richmond American Homes
- 2022-10-11: GLAMPERS INN, Hurricane: UTRC05929, held by Nielson Development
VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE among its neighbors
208 discharge permits are in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804); UTRC05923 is one.
Other permits in the Dry Canyon-Frontal Utah Lake subwatershed (HUC 160202010804)
- 162 W 800 S, Orem: UTRH03871, minor, term to 2022-09-15
- 2023 OREM CITY CONCRETE PROJECT - VARIOUS LOCATIONS, Orem: UTRL00498
- ABBEY ROAD, Orem: UTRC03795, minor, term to 2024-11-02
- ABBEY ROAD LOT 13, Orem: UTRH11220, minor, term to 2027-04-05
- ACADIA HEIGHTS, Orem: UTRC10764, minor, term to 2026-04-24
- ADHESIVES TECHNOLOGY CORPORATION, Orem: UTNX00700, minor, term to 2030-09-25
- ALLIE & STACY RESIDENCE, Vineyard: UTRH05813, minor, term to 2023-09-08
- ALMA MILES RESIDENCE, Orem: UTRH05948, minor, term to 2023-10-11
- ALTUS GENEVA RETAIL LOT 203 - VINEYARD, Vineyard: UTRC09202, minor, term to 2025-07-11
- ARCHIBALD RESIDENCE OREM, Orem: UTRH11543, minor, term to 2027-06-07
What stands out
- Its term runs 364 days, October 8, 2022 to October 7, 2023; the term ended 1,074 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE |
|---|---|
| Permittee | Landmark Excavating |
| NPDES ID | UTRC05923 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 8, 2022 |
| Expires | October 7, 2023 |
| Agency | UTDEQ |
| Address | Vineyard, UT 84058 |
| Subwatershed | Dry Canyon-Frontal Utah Lake (HUC 160202010804) |
NPDES UTRC05923: effluent limits and exceedances
VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE (NPDES UTRC05923): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC05923: no pollutant row on file.
NPDES UTRC05923: inspections, violations and enforcement
NPDES UTRC05923 (VINEYARD CITY PHASE 1 WATER DISTRIBUTION PIPELINE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC05923
NPDES UTRC05923: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC05923
NPDES UTRC05923: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.