NPDES UTRC06046 · Clean Water Act
SUMMER SPRINGS PHASE 1, Salem, UT: NPDES UTRC06046 discharge permit, effluent exceedances, inspections, penalties
SUMMER SPRINGS PHASE 1, Salem, Utah: General permit coverage UTRC06046, held by Bach Land and Development; Construction stormwater; Effective; issued November 8, 2022, term to November 7, 2023, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 4,854 were issued before UTRC06046. Bach Land and Development holds 3 permits in Utah.
Other permits held by Bach Land and Development
- CARRINGTON SQUARE PHASE 4, Kearns: UTRC00787, issued 2023-06-14
- SKYLINE RIDGE PHASE 2 PLAT 6, Eagle Mountain: UTRC04304, issued 2022-01-31
Coverages issued nearest UTRC06046
- 2022-11-07: ROSEWOOD ESTATES (SALISBURY), St. George: UTRC03956, held by Salisbury Developers
- 2022-11-07: MAYNARD RESIDENCE, Pleasant View: UTRH04131, held by Envision Homes
- 2022-11-07: BISON BLUFFS 51, Park City: UTRH06030, held by Prime Builders
- 2022-11-07: ASPEN CAMP 70, Park City: UTRH06031, held by Prime Builders
- 2022-11-08: LIBERTY LANE, Washington: UTRC03906, held by Hoopes Construction, Inc
- 2022-11-08: CACHE VALLEY TRANSIT DISTRICT, North Logan: UTRC06047, held by Big-D Construction
- 2022-11-09: EMPIRE FLOORING, Saratoga Springs: UTRC03974, held by Quillen Construction
- 2022-11-09: FOX CORNER, Layton: UTRC06053, held by Marsh Construction
- 2022-11-09: WHITE DOME COMMERCIAL CENTER, St. George: UTRC06054, held by Quality Excavation
- 2022-11-09: CARLGREN-RICHMOND-CUSTOM, Richmond: UTRH06034, held by Sierra Homes Construction
SUMMER SPRINGS PHASE 1 among its neighbors
400 discharge permits are in the Beer Creek subwatershed (HUC 160202020603); UTRC06046 is one.
Other permits in the Beer Creek subwatershed (HUC 160202020603)
- 1102 SOUTH 670 WEST, Salem: UTRH06814, minor, term to 2024-07-06
- 1115 EAGLENEST DR, Woodland Hills: UTRH07467, minor, term to 2025-01-15
- 2130 JOHNSON RESIDENCE, Woodland Hills: UTRH02303, minor, term to 2024-02-15
- 24 LEGACY HILLS, Salem: UTRH07843, minor, term to 2025-04-02
- 25 QUAIL MOUNTAIN, Payson: UTRH10982, minor, term to 2027-02-10
- 254 WEST OLYMPIC LANE, Elk Ridge: UTRH03071, minor, term to 2022-05-18
- 259 EAST 100 NORTH BUTIKOFER RESIDENCE, Salem: UTRH04300, minor, term to 2022-11-25
- 337 W 100 S PAYSON, UTAH 84651, Payson: UTRC11415, minor, term to 2026-08-07
- 472 E SELMAN RIDGE, Salem: UTRH01788, minor, term to 2021-11-24
- 516 N ELK RIDGE, Elk Ridge: UTRH03069, minor, term to 2022-05-18
What stands out
- Its term runs 364 days, November 8, 2022 to November 7, 2023; the term ended 1,072 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 17,184 discharge permits on the register in Utah; 14,166 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SUMMER SPRINGS PHASE 1 |
|---|---|
| Permittee | Bach Land and Development |
| NPDES ID | UTRC06046 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 8, 2022 |
| Expires | November 7, 2023 |
| Agency | UTDEQ |
| Address | Salem, UT 84660 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Beer Creek (HUC 160202020603) |
NPDES UTRC06046: effluent limits and exceedances
SUMMER SPRINGS PHASE 1 (NPDES UTRC06046): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC06046: no pollutant row on file.
NPDES UTRC06046: inspections, violations and enforcement
NPDES UTRC06046 (SUMMER SPRINGS PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC06046
NPDES UTRC06046: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC06046
NPDES UTRC06046: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.