NPDES UTRC06429 · Clean Water Act
MOAB SITLA PHASE 2, Moab, UT: NPDES UTRC06429 discharge permit, effluent exceedances, inspections, penalties
MOAB SITLA PHASE 2, Moab, Utah: General permit coverage UTRC06429, held by Advanced Construction and Design; Construction stormwater; Effective; issued February 22, 2023, term to February 21, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 5,196 were issued before UTRC06429. Advanced Construction and Design holds 2 permits in Utah.
Other permits held by Advanced Construction and Design
- MUSTANG PASS, Washington: UTRC12152, issued 2026-01-14
Coverages issued nearest UTRC06429
- 2023-02-21: GUNNELL RESIDENCE, South Jordan: UTRH04873, held by Evco Development, Inc
- 2023-02-21: 2215 SOUTH 2000 EAST, Salt Lake City: UTRH06302, held by Havenhill Homes, LLC
- 2023-02-21: 53 SOUTH 950 EAST, Springville: UTRH06303, held by Sandro Sanchez
- 2023-02-22: RIVER TRAIL TOWN HOMES, St. George: UTRC02106, held by Feller Ventures
- 2023-02-22: BLACK RIDGE TOWNHOMES 2, 4, 6, St. George: UTRC04328, held by Dojo Construction
- 2023-02-22: KEYSTONE SUBDIVISION, Provo: UTRC06430, held by Rino Excavating
- 2023-02-22: JENKINS RESIDENCE, South Jordan: UTRC06431, held by Huish Construction
- 2023-02-22: FINDLAY HYUNDAI-SIENNA HILLS AUTO MALL, Washington: UTRC06433, held by Feller Enterprises
- 2023-02-22: BORROWMAN RESIDENCE, Santa Clara: UTRH06307, held by Nick Borrowman
- 2023-02-23: KENNA LANE SUBDIVISION, Bluffdale: UTRC01886, held by Alairhomes
MOAB SITLA PHASE 2 among its neighbors
41 discharge permits are in the Lower Pack Creek subwatershed (HUC 140300050403); UTRC06429 is one.
Other permits in the Lower Pack Creek subwatershed (HUC 140300050403)
- 2024 MOAB DOT PIPELINE REPLACEMENT, Moab: UTRC09025, minor, term to 2025-06-16
- AGGIE TOWNHOMES SUBDIVISION, Moab: UTRC09310, minor, term to 2025-07-31
- ALL AMERICAN EWP, Moab: UTRC12079, minor, term to 2026-12-21
- ARROYO CROSSING, Moab: UTRC04177, minor, term to 2025-01-13
- ARROYO CROSSING, Moab: UTRC12151, minor, term to 2027-01-12
- BIRCH AREA SEWER IMPROVEMENT PROJECT, Moab: UTRL00524
- CANYONLANDS TRANSFER STATION, Moab: UTRI00124, minor, term to 2023-12-31
- DABS - MOAB LIQUOR STORE, Moab: UTRC10485, minor, term to 2026-03-17
- DESERT SOL, Moab: UTRC07405, minor, term to 2024-08-13
- HIDEAWAY SUBDIVISION, Moab: UTRC04048, minor, term to 2022-12-16
Identity
| Facility | MOAB SITLA PHASE 2 |
|---|---|
| Permittee | Advanced Construction and Design |
| NPDES ID | UTRC06429 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 22, 2023 |
| Expires | February 21, 2024 |
| Agency | UTDEQ |
| Address | Moab, UT 84532 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Pack Creek (HUC 140300050403) |
NPDES UTRC06429: effluent limits and exceedances
MOAB SITLA PHASE 2 (NPDES UTRC06429): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC06429: no pollutant row on file.
NPDES UTRC06429: inspections, violations and enforcement
NPDES UTRC06429 (MOAB SITLA PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC06429
NPDES UTRC06429: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC06429
NPDES UTRC06429: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.