NPDES UTRC07585 · Clean Water Act
GOLDEN CEDAR ESTATES, Cedar Fort, UT: NPDES UTRC07585 discharge permit, effluent exceedances, inspections, penalties
GOLDEN CEDAR ESTATES, Cedar Fort, Utah: General permit coverage UTRC07585, held by Arrow Engineering; Construction stormwater; Administratively continued; issued September 14, 2023, term to September 13, 2024, by UTDEQ.
Utah holds 14,146 Construction stormwater coverages of this permit type in EPA’s file; 6,117 were issued before UTRC07585. Arrow Engineering holds 3 permits in Utah.
Other permits held by Arrow Engineering
- RIVER HAVEN SUBDIVISION, Oakley: UTRC10006, issued 2024-12-11
- HARMONY PHASE A PLATS 17, 18, 19, 21 & 22, Eagle Mountain: UTRC13498, issued 2026-09-01
Coverages issued nearest UTRC07585
- 2023-09-13: MONTICELLO-MEADOWS-SUBDIVISION, Wellsville: UTRC07577, held by Bell Mountain Construction
- 2023-09-13: FOWLER RESIDENCE - LOT 16 MAPLE BENCH ESTATES, Mapleton: UTRH07071, held by Green Tech Construction
- 2023-09-13: PETERSON HOME, Bluffdale: UTRH07074, held by Azure Building Group
- 2023-09-13: PARK SIDE #207, Toquerville: UTRH07075, held by Wall 2 Wall Construction
- 2023-09-14: 1800 N SEWER REALIGNMENT PHASE 2, Salt Lake City: UTRC07580, held by Whitaker Construction Co
- 2023-09-14: HILL FIELD REPLACEMENT, Layton: UTRC07586, held by Whitaker Construction Co
- 2023-09-14: JACKSON RESIDENCE - BREEN HOMES, Park City: UTRH07076, held by Breen Homes
- 2023-09-15: THE ESTATES AT BURKE SPRINGS - PERRY HOMES LOTS, Washington: UTRC07589, held by Perry Homes Utah, Inc.
- 2023-09-15: ROBSON FARMS LOT 14, Plain City: UTRH07080, held by Kelly Jackson
- 2023-09-16: WILD PLUM, Wellsville: UTRH07083, held by Josh Barfuss
GOLDEN CEDAR ESTATES among its neighbors
28 discharge permits are in the Threemile Canyon subwatershed (HUC 160202010401); UTRC07585 is one.
Other permits in the Threemile Canyon subwatershed (HUC 160202010401)
- BRANDON PARK, Eagle Mountain: UTR387487, minor, term to 2022-07-02
- BRYLEE ESTATES TOWNHOMES, Eagle Mountain: UTRC00231, minor, term to 2022-03-30
- BRYLEE ESTATES TOWNHOMES - RENEWED, Eagle Mountain: UTRC07290, minor, term to 2025-07-21
- BRYLEE ESTATES TOWNS PHASE 3, Eagle Mountain: UTRC10612, minor, term to 2026-04-03
- BRYLEE FARMS, Eagle Mountain: UTRC02846, minor, term to 2022-05-31
- BRYLEE FARMS, Eagle Mountain: UTRC05168, minor, term to 2023-05-31
- BRYLEE FARMS, Eagle Mountain: UTRC06831, minor, term to 2024-05-04
- BRYLEE NORTH, Eagle Mountain: UTRC08144, minor, term to 2025-01-08
- CEDAR FORT GRAVEL PIT, Cedar Fort: UTR268293, minor, term to 2015-12-31
- CEDAR FORT QUARRY, Cedar Fort: UTRI00299, minor, term to 2028-12-31
Identity
| Facility | GOLDEN CEDAR ESTATES |
|---|---|
| Permittee | Arrow Engineering |
| NPDES ID | UTRC07585 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 14, 2023 |
| Expires | September 13, 2024 |
| Agency | UTDEQ |
| Address | Cedar Fort, UT 84013 |
| Subwatershed | Threemile Canyon (HUC 160202010401) |
NPDES UTRC07585: effluent limits and exceedances
GOLDEN CEDAR ESTATES (NPDES UTRC07585): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES UTRC07585: no pollutant row on file.
NPDES UTRC07585: inspections, violations and enforcement
NPDES UTRC07585 (GOLDEN CEDAR ESTATES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES UTRC07585
NPDES UTRC07585: one email when its EPA record changes — $99/month.
Permits near NPDES UTRC07585
NPDES UTRC07585: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.